Junqing Li

Junqing Li


Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 December 2022 in Knowledge-Based Systems
Verified
Journal Article
Closed access
QZQingke Zhang
Qingke Zhang
HGHao Gao
Hao Gao
ZZZhi-Hui Zhan
Zhi-Hui Zhan
JLJunqing Li
Junqing Li
HZHuaxiang Zhang
Huaxiang Zhang

12 January 2011 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
JLJunqing Li
Junqing Li
QPQuan-Ke Pan
Quan-Ke Pan
KGKai-Zhou Gao
Kai-Zhou Gao

8 February 2022 in IEEE Transactions on Emerging Topics in Computational Intelligence
Verified
Journal Article
Closed access
YDYu Du
Yu Du
JLJunqing Li
Junqing Li
XCXiao-Long Chen
Xiao-Long Chen
PDPeiyong Duan
Peiyong Duan
QPQuan-Ke Pan
Quan-Ke Pan
In this study, a flexible job shop scheduling problem with time-of-use electricity price constraint is considered. The problem includes machine processing speed, setup time, idle time, and the transportation time between machines. Both maximum completion time and total electricity price are optimized simultaneously. A hybrid multi-objective optimization algorithm of estimation of distribution algorithm and deep Q-network is proposed to solve this. The processing sequence, machine assignment, and processing speed assignment are all described using a three-dimensional solution representation. Two knowledge-based initialization strategies are designed for better performance. In the estimation of distribution algorithm component, three probability matrices corresponding to solution representation are provided. In the deep Q-network component, 34 state features are selected to describe the scheduling situation, while nine knowledge-based actions are defined to refine the scheduling solution, and the reward based on the two objectives is designed. As the knowledge for initialization and optimization strategies, five properties of the considered problem are proposed. The proposed mixed integer linear programming model of the problem is validated by exact solver CPLEX. The results of the numerical testing on wide-range scale instances show that the proposed hybrid algorithm is efficient and effective at solving the integrated flexible job shop scheduling problem.

16 November 2022 in IEEE Transactions on Systems, Man, and Cybernetics: Systems
Verified
Journal Article
Closed access
HLHanxiao Li
Hanxiao Li
Kaizhou GaoKaizhou Gao
Kaizhou Gao
PDPeiyong Duan
Peiyong Duan
JLJunqing Li
Junqing Li
LZLe Zhang
Le Zhang
A permutation flow-shop scheduling problem (PFSP) has been studied for a long time due to its significance in real-life applications. This work proposes an improved artificial bee colony (ABC) algorithm with $Q$ -learning, named QABC, for solving it with minimizing the maximum completion time (makespan). First, the Nawaz–Enscore–Ham (NEH) heuristic is employed to initialize the population of ABC. Second, a set of problem-specific and knowledge-based neighborhood structures are designed in the employ bee phase. $Q$ -learning is employed to favorably choose the premium neighborhood structures. Next, an all-round search strategy is proposed to further enhance the quality of individuals in the onlooker bee phase. Moreover, an insert-based method is applied to avoid local optima. Finally, QABC is used to solve 151 well-known benchmark instances. Its performance is verified by comparing it with the state-of-the-art algorithms. Experimental and statistical results demonstrate its superiority over its peers in solving the concerned problems.

10 October 2022 in IEEE Transactions on Neural Networks and Learning Systems
Verified
Journal Article
Closed access
YDYu Du
Yu Du
JLJunqing Li
Junqing Li
CLChengdong Li
Chengdong Li
PDPeiyong Duan
Peiyong Duan
Flexible job shop scheduling problem (FJSP) has attracted research interests as it can significantly improve the energy, cost, and time efficiency of production. As one type of reinforcement learning, deep Q-network (DQN) has been applied to solve numerous realistic optimization problems. In this study, a DQN model is proposed to solve a multiobjective FJSP with crane transportation and setup times (FJSP-CS). Two objectives, i.e., makespan and total energy consumption, are optimized simultaneously based on weighting approach. To better reflect the problem realities, eight different crane transportation stages and three typical machine states including processing, setup, and standby are investigated. Considering the complexity of FJSP-CS, an identification rule is designed to organize the crane transportation in solution decoding. As for the DQN model, 12 state features and seven actions are designed to describe the features in the scheduling process. A novel structure is applied in the DQN topology, saving the calculation resources and improving the performance. In DQN training, double deep Q-network technique and soft target weight update strategy are used. In addition, three reported improvement strategies are adopted to enhance the solution qualities by adjusting scheduling assignments. Extensive computational tests and comparisons demonstrate the effectiveness and advantages of the proposed method in solving FJSP-CS, where the DQN can choose appropriate dispatching rules at various scheduling situations.

8 October 2019 in IEEE Transactions on Cybernetics
Verified
Journal Article
Closed access
JLJunqing Li
Junqing Li
MSMei-Xian Song
Mei-Xian Song
LWLing Wang
Ling Wang
PDPeiyong Duan
Peiyong Duan
YHYuyan Han
Yuyan Han
QPQuan-Ke Pan
Quan-Ke Pan
In this article, we propose a hybrid artificial bee colony (ABC) algorithm to solve a parallel batching distributed flow-shop problem (DFSP) with deteriorating jobs. In the considered problem, there are two stages as follows: 1) in the first stage, a DFSP is studied and 2) after the first stage has been completed, each job is transferred and assembled in the second stage, where the parallel batching constraint is investigated. In the two stages, the deteriorating job constraint is considered. In the proposed algorithm, first, two types of problem-specific heuristics are proposed, namely, the batch assignment and the right-shifting heuristics, which can substantially improve the makespan. Next, the encoding and decoding approaches are developed according to the problem constraints and objectives. Five types of local search operators are designed for the distributed flow shop and parallel batching stages. In addition, a novel scout bee heuristic that considers the useful information that is collected by the global and local best solutions is investigated, which can enhance searching performance. Finally, based on several well-known benchmarks and realistic industrial instances and via comprehensive computational comparison and statistical analysis, the highly effective performance of the proposed algorithm is favorably compared against several algorithms in terms of both solution quality and population diversity.