Fangying Dong

Prof. Fangying Dong


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 September 2024 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
FDFangying Dong
Fangying Dong
HYHuiyong Yin
Huiyong Yin
HRHongxu Ren
Hongxu Ren
WCWenju Cheng
Wenju Cheng
STShuzhen Tai
Shuzhen Tai
BWBin Wu
Bin Wu


24 May 2022 in Energies
Verified
Journal Article
Open access
PDF file
HYHuiyong Yin
Huiyong Yin
FDFangying Dong
Fangying Dong
YZYiwen Zhang
Yiwen Zhang
WCWenju Cheng
Wenju Cheng
PZPeihe Zhai
Peihe Zhai
XLXin Li
Xin Li
The mining-induced water-conducting fracture zone (WCFZ) plays a critical role in roof water damage prevention and ecological protection. The measured heights of the WCFZ were collected from 52 working faces or boreholes in the Ordos Basin mining area. Four factors influencing the mining-induced height of the WCFZ, i.e., mining thickness, proportion coefficient of hard rock, working width, and mining depth, were analyzed. The optimal unitary function model of each factor and the height of the WCFZ were obtained through single-factor analysis. The grey correlation method and fuzzy ordered binary comparison method were used to determine the comprehensive weight, and the weighted improved multiple regression model was obtained by combination and iteration. The relative error of the model was basically controlled within 10%. Finally, taking the Qingshuiying Coalfield as an application case, we predicted the mining-induced height of the WCFZ by using the new prediction model. The spatial distribution characteristics of the WCFZ were analyzed by the geographic information system. In addition, Groundwater Modeling System (GMS) software was used to build a 3D structure model of WCFZ height to visualize the spatial distribution rules of the WCFZ. The results showed that the height of the WCFZ can be predicted quantitatively by this new method, and the visualization of the WCFZ can be realized. The proposed method effectively analyzes and predicts the mining-induced height of the WCFZ so that water gushing risks from overlying aquifers can be prevented or mitigated in mines.


4 March 2024 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
HYHuiyong Yin
Huiyong Yin
WZWei Zhou
Wei Zhou
FDFangying Dong
Fangying Dong
LYLiu Yongming
Liu Yongming
CSChuanhua Shi
Chuanhua Shi
WCWenju Cheng
Wenju Cheng

9 January 2024 in Earth Science Informatics
Verified
Journal Article
Closed access
PDF file
HYHuiyong Yin
Huiyong Yin
SLShuo Li
Shuo Li
GXGuoliang Xu
Guoliang Xu
DXDaolei Xie
Daolei Xie
CJCheng Jiang
Cheng Jiang
BWBin Wu
Bin Wu