Yongbo Yuan

Yongbo Yuan


Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 December 2021 in Sensors
Verified
Journal Article
Open access
PDF file
CWChao Wu
Chao Wu
YYYongbo Yuan
Yongbo Yuan
YTYang Tang
Yang Tang
BTBoquan Tian
Boquan Tian
As a revolutionary technology, terrestrial laser scanning (TLS) is attracting increasing interest in the fields of architecture, engineering and construction (AEC), with outstanding advantages, such as highly automated, non-contact operation and efficient large-scale sampling capability. TLS has extended a new approach to capturing extremely comprehensive data of the construction environment, providing detailed information for further analysis. This paper presents a systematic review based on scientometric and qualitative analysis to summarize the progress and the current status of the topic and to point out promising research efforts. To begin with, a brief understanding of TLS is provided. Following the selection of relevant papers through a literature search, a scientometric analysis of papers is carried out. Then, major applications are categorized and presented, including (1) 3D model reconstruction, (2) object recognition, (3) deformation measurement, (4) quality assessment, and (5) progress tracking. For widespread adoption and effective use of TLS, essential problems impacting working effects in application are summarized as follows: workflow, data quality, scan planning, and data processing. Finally, future research directions are suggested, including: (1) cost control of hardware and software, (2) improvement of data processing capability, (3) automatic scan planning, (4) integration of digital technologies, (5) adoption of artificial intelligence.

21 June 2019 in Sensors
Verified
Journal Article
Open access
PDF file
ZYZhen Yang
Zhen Yang
YYYongbo Yuan
Yongbo Yuan
MZMingyuan Zhang
Mingyuan Zhang
Xuefeng ZhaoXuefeng Zhao
Xuefeng Zhao
YZYang Zhang
Yang Zhang
BTBoquan Tian
Boquan Tian
Tower cranes are the most commonly used large-scale equipment on construction site. Because workers can’t always pay attention to the environment at the top of the head, it is often difficult to avoid accidents when heavy objects fall. Therefore, safety construction accidents such as struck-by often occurs. In order to address crane issue, this research recorded video data by a tower crane camera, labeled the pictures, and operated image recognition with the MASK R-CNN method. Furthermore, The RGB color extraction was performed on the identified mask layer to obtain the pixel coordinates of workers and dangerous zone. At last, we used the pixel and actual distance conversion method to measure the safety distance. The contribution of this research to safety problem area is twofold: On one hand, without affecting the normal behavior of workers, an automatic collection, analysis, and early-warning system was established. On the other hand, the proposed automatic inspection system can help improve the safety operation of tower crane drivers.

27 October 2022 in Buildings
Verified
Journal Article
Open access
PDF file
XXXiaolin Xun
Xiaolin Xun
JZJun Zhang
Jun Zhang
YYYongbo Yuan
Yongbo Yuan
Safety risk assessment is essential in ensuring the smooth construction of undersea tunnels. Obtaining reasonable safety risk assessment results requires multi-source information that enjoys static and dynamic attributes. However, acquiring and utilizing such uncertain information creates difficulties in the decision-making process. Therefore, this paper proposes a safety risk assessment approach based on building information modeling (BIM), intuitionistic fuzzy set (IFS) theory, and Dempster–Shafer (D-S) evidence theory. Firstly, an undersea tunnel construction collapse risk evaluation index system is established to clarify the information requirements of the pre-construction and construction stages. The semantic information of the BIM geometric model is then enriched through industry foundation classes (IFC) extension to match the multi-criteria decision-making (MCDM) process, with BIM technology used to assist in information acquisition and risk visualization. Finally, based on the intuitionistic fuzzy D-S evidence theory, multi-information fusion is performed to dynamically determine safety risk levels. Specifically, IFS theory is utilized for basic probability assignments (BPAs) determination before applying D-S evidence theory. The conflicting evidence is dealt with by reliability calculation based on the normalized Hamming distance between pairs of IFSs, while safety risk levels are accomplished with score functions of intuitionistic fuzzy values (IFVs). The proposed method is applied to collapse risk assessment in the karst developed area of a shield tunnel construction project in Dalian, China, and the feasibility and effectiveness are verified. The novelty of the proposed method lies in: (1) information collaboration between the BIM model and the dynamic safety risk assessment process being realized through IFC-based semantic enrichment and Dynamo programming to enhance the decision-making process and (2) the introduction of IFS theory to improve the applicability of D-S evidence theory in expressing fuzziness and hesitation during multi-information fusion. With the proposed method, dynamic safety risk assessment of undersea tunnel construction projects can be performed under uncertainty, fuzziness, and a conflicting environment, while the safety risk perception can be enhanced through visualization.

1 September 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KGKe Guo
Ke Guo
YYYongbo Yuan
Yongbo Yuan
The development of green residences is crucial to reducing energy consumption and carbon emissions of the construction industry. However, the study on the spatial distribution characteristics of green residences and its influencing factors has not attracted enough attention in the academic circles. Base on the panel database on the number of each star green residences and their driving factors at the municipal level from 2008 to 2016, this paper employed the Weighted Standard Deviational Ellipse model to reveal the spatial and temporal evolution features of green residences in China, creatively introduced an improved Gini coefficient (G′-score) to measure the green residences development in each city, and utilized the panel Tobit model and average marginal effect to identify the driving mechanisms and key factors of green residences from economy, society, the real estate market, policy and climate. The main conclusions show that: (1) China has formed a relatively stable and clear temporal and spatial evolution path since 2011, such as the center of gravity and coverage having moved to the west, and the direction of development trend having weakened; (2) China’s green residence is mainly distributed in the central and eastern regions, and the main direction layout is northeast–southwest; (3) the development of green residences is the result of the interaction of various factors, and the driving force of each factor varies greatly under the single action and the interaction; (4) the driving effects of the same factor on green residences with different star ratings are inconsistent in sign, magnitude, and significance, the same as for each factor under the same star rating.

3 December 2018 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HJHaifeng Jin
Haifeng Jin
MZMingyuan Zhang
Mingyuan Zhang
YYYongbo Yuan
Yongbo Yuan
In construction projects, the planning objectives include the safety and labor productivity of the activities, along with the cost influence affecting the overall performance of construction. Temporary facilities are critical in supporting structures and equipment that impact the direct task executions and resource transportation during various construction stages. The positioning of temporary facilities and the relative spatial relation between multiple facilities are critical factors that affect the success of construction delivery. To ensure the balance among safety, labor productivity and construction cost performance, all influencing factors associated with the construction objectives should be taken into account in temporary facility layout planning. This paper proposes a novel multi-criteria temporary facility layout planning model that integrates Analytic Network Process (ANP) modeling and simulation-based sensitivity evaluation, which effectively transforms the spatial layout planning problem into a mathematical decision problem. An application example is analyzed to demonstrate its capabilities of optimizing temporary facility layout planning. The proposed framework provides the construction managers and layout planners with a useful tool for selecting the optimal alternative of temporary facility layout plan on the construction site.

16 October 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
YDYanchao Du
Yanchao Du
HZHengyu Zhou
Hengyu Zhou
YYYongbo Yuan
Yongbo Yuan
HXHong Xue
Hong Xue
Integrated project delivery (IPD) is a new emerging delivery system, contributes to increase value to the owner, reduces waste and maximizes efficiency in the life cycle of projects. However, IPD system has not yet shifted from pilot-alike or particular-purposed cases to large-scale applications. The huge advantages of building information modeling (BIM) are far from being exploited, which directly leads to the delivered outcomes below expectations, thereby causing obstacles to widespread application of IPD system. The reasons impeding the successful application of BIM has been a hot topic. Previous studies suggested that moral hazard behavior is a critical inducer leading to the undesirable outcomes. However, very few studies have studied the evolution mechanism of moral hazard behavior for BIM application. To fill this knowledge gap, this study proposed a novel model, aiming to capture dynamically the interactive behavior of BIM-based strategy selections using evolutionary game theory. Five parameters of monitoring cost, proprietary cost, incentive payment, punishment and speculative benefit are extracted and defined in the proposed model. Numerical simulations are conducted with MATLAB 2016a. The simulation results showed that when incentive payment is higher than the sum of speculative benefit and proprietary cost, interactive behavior of both game players will move toward the optimal portfolio strategy. Incentive payment and punishment have negative correlations with the probability of moral hazard behavior for BIM application. Parameters of speculative benefit and proprietary cost affect positively implementation probability of moral hazard behavior of employing BIM. This study can provide theoretical and managerial implications for integrated project managers and related government department to improve implementation of BIM and IPD system, and also contribute to its sustainable development.