Purpose: In the past decades, artificial intelligence (AI)-based hybrid methods have been increasingly applied in construction risk management practices. The purpose of this paper is to review and compile the current AI methods used for cost-risk assessment in the construction management domain in order to capture complexity and risk interdependencies under high uncertainty.Design/methodology/approach: This paper makes a content analysis, based on a comprehensive literature review of articles published in high-quality journals from the years 2008 to 2018. Fuzzy hybrid methods, such as fuzzy-analytical network processing, fuzzy-artificial neural network and fuzzy-simulation, have been widely used and dominated in the literature due to their ability to measure the complexity and uncertainty of the system.Findings: The findings of this review article suggest that due to the limitation of subjective risk data and complex computation, the applications of these AI methods are limited in order to address cost overrun issues under high uncertainty. It is suggested that a hybrid approach of fuzzy logic and extended form of Bayesian belief network (BBN) can be applied in cost-risk assessment to better capture complexity-risk interdependencies under uncertainty.Research limitations/implications: This study only focuses on the subjective risk assessment methods applied in construction management to overcome cost overrun problem. Therefore, future research can be extended to interpret the input data required to deal with uncertainties, rather than relying solely on subjective judgments in risk assessment analysis.Practical implications: These results may assist in the management of cost overrun while addressing complexity and uncertainty to avoid chaos in a project. In addition, project managers, experts and practitioners should address the interrelationship between key complexity and risk factors in order to plan risk impact on project cost. The proposed hybrid method of fuzzy logic and BBN can better support the management implications in recent construction risk management practice.Originality/value: This study addresses the applications of AI-based methods in complex construction projects. A proposed hybrid approach could better address the complexity-risk interdependencies which increase cost uncertainty in project.
Young academics have been facing a problem of high turnover rate due to missing links between the institutions’ policies and the performance. This study explores the effect of job embeddedness and community embeddedness on creative work performance and intentions to leave of young teaching staff in academic institutions in Pakistan. In this study, 300 qualified young academics from public and private universities were selected as subjects and asked to complete a questionnaire. Data were collected via mail-survey. A variance-based structural equation model is employed to measure the path model. The results show that the fit-dimension of organizational- and community-embeddedness, along with the moderating effect of organization size and the availability of nearby alternative jobs have a significant impact on improving perceived creative performance and reducing staff turnover intentions. This study suggests that organizations should focus on organizational-fit and community-fit constructs in their nurturing strategies to embed young teachers in their academic institutions. This study also suggests that monetary rewards only are relatively ineffective to improve retention. Hence, public and private sector universities should facilitate meaningful contributions from young teachers in creative work and provide opportunities for social interactions and personal development.
15 May 2020 in International Journal of Managing Projects in Business
Purpose: Risk analysis plays a vital role in controlling and managing cost overruns in complex construction projects, particularly where uncertainty is high. This study attempts to address an important issue of cost overrun that encountered by metropolitan rapid transit projects in relation to the significance of risk involved under high uncertainty.Design/methodology/approach: In order to solve cost overrun problems in metropolitan transit projects and facilitate the decision-makers for effective future budgeting, a cost-risk contingency framework has been designed using fuzzy logic, analytical hierarchy process and Monte Carlo simulation.Findings: Initially, a hierarchical breakdown structure of important complexity-driven risk factors has been conceptualized herein using relative importance index. Later, a proposed cost-risk contingency framework has investigated the expected total construction cost in order to consider the additional budgeted cost required to mitigate the risk consequences for particular project activity. The results of cost-risk analysis imply that poor design issues, an increase in material prices and delays in relocating facilities show higher dependency and increase the risk of cost overrun in metropolitan transit projects.Practical implications: The findings and implication for project managers could possibly be achieved by assuming the proposed cost-risk contingency framework under high uncertainty of cost found in this research. Furthermore, this procedure may be used by experts from other engineering domains by replacing and considering the complex relationship between complexity-risk factors.Originality/value: This study contributes to the body of knowledge by providing a practical contingency model to identify and evaluate the additional risk cost required to compute total construction cost for getting stability in future budgeting.
To assess the time-varying dynamics in value-at-risk (VaR) estimation, this study has employed an integrated approach of dynamic conditional correlation (DCC) and generalized autoregressive conditional heteroscedasticity (GARCH) models on daily stock return of the emerging markets. A daily log-returns of three leading indices such as KSE100, KSE30, and KSE-ALL from Pakistan Stock Exchange and SSE180, SSE50 and SSE-Composite from Shanghai Stock Exchange during the period of 2009–2019 are used in DCC-GARCH modeling. Joint DCC parametric results of stock indices show that even in the highly volatile stock markets, the bivariate time-varying DCC model provides better performance than traditional VaR models. Thus, the parametric results in the DCC-GRACH model indicate the effectiveness of the model in the dynamic stock markets. This study is helpful to the stockbrokers and investors to understand the actual behavior of stocks in dynamic markets. Subsequently, the results can also provide better insights into forecasting VaR while considering the combined correlational effect of all stocks.
24 October 2019 in Engineering, Construction and Architectural Management
Purpose: Cost overrun is inherent to project chaos, which is one of the key drivers of project failure. The purpose of this paper is to explore the critical elements of complexity-risk interdependency for cost-chaos in the construction management domain by utilizing a multi-criteria decision model. Design/methodology/approach: A total of 12 complexity and 60 risk attributes are initially identified from the literature and using expert’s judgements. For the development of a structured hierarchy of key complexity and risk drivers, a real-time Delphi process is adopted for recording and evaluating the responses from experts. Afterwards, a pair-wise comparison using analytical network processing is performed to measure complexity-risk interdependencies against cost alternatives. Findings: The findings of the integrated priority decision index (IPDI) suggest that uncertainties related to contingency and escalation costs are the main sources of cost overrun in project drift, along with the key elements such as “the use of innovative technology,” “multiple contracts,” “low advance payment,” “change in design,” “unclear specifications” and “the lack of experience” appear to be more significant to chaos in complexity-risk interdependency network. Research limitations/implications: This study did not address the uncertainty and vulnerability exit in the judgment process, therefore, this framework can be extended using fuzzy logic to better evaluate the significance of cost-chaos drivers. Practical implications: These results may assist the management of cost overrun to avoid chaos in a project. The proposed model can be applied within project risk management practices to make better-informed technical decisions in the early phases of the project life cycle where uncertainty is high. Originality/value: This research addresses the importance of cost overruns as a source of project chaos in dynamic systems where projects reach the edge of chaos and progress stops. A new IPDI index contributes toward evaluating the severity of complexity and risk and their interdependencies which create cost-chaos in infrastructure transport projects.