Po-Chuan Huang

Mr. Po-Chuan Huang

College of Construction and Development, Feng Chia University, Taichung, Taiwan
orcid

Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 August 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
Po-Chuan HuangPo-Chuan Huang
Po-Chuan Huang
SFSzu wei Fang
Szu wei Fang
WLWei Lin
Wei Lin
SLShwu-Ting Lee
Shwu-Ting Lee
Existing residential buildings require peak-demand governance even when complete sub-metering and advanced control systems are unavailable. This study develops a replicable asset-light demand-side management (DSM) protocol for contracted-capacity risk assessment. The protocol integrates utility-billing records, 15 min community main-meter (MP) and selected sub-meter data, operational-period segmentation, residual-load treatment, capacity-risk indicators, rule selection, event decomposition, and post-calibration verification. The protocol was examined in a Taiwanese condominium using utility records beginning in June 2022 and stabilized digital-meter data from April 2023 to May 2026. Four sub-metered systems explained 76.3% of monthly MP electricity use, with 23.7% retained as residual load. Under a 40 kW operational reference boundary, maximum MP demand reached 41.12 kW, yielding a utilization ratio of 1.028 and a relative capacity buffer of −2.8%. In a representative critical interval, the aggregate mechanical-power boundary contributed 79.6% of MP demand; however, equipment-level EV output was not independently recorded. After rule-based calibration, maximum MP demand was 29.36 kW, and no MP threshold-exceedance intervals or billing-level over-capacity surcharges were documented. These findings provide observational performance evidence rather than definitive causal proof. The contribution is a recalibratable diagnostic sequence for capacity-risk governance under partial metering and property-management constraints.
1