Siyu Tu

Dr. Siyu Tu

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 April 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
STSiyu Tu
Siyu Tu
MJMingtao Jia
Mingtao Jia
Liguan WangLiguan Wang
Liguan Wang
SFShuzhao Feng
Shuzhao Feng
SHShuang Huang
Shuang Huang
Equipment failure is a common problem in mining operations, resulting in significant delays and reductions in production efficiency. To address this problem, this paper proposes a dynamic scheduling model for underground metal mines under equipment failure conditions. The model aims to minimize the impact of equipment failures on production operations while avoiding extensive equipment changes. A case study of the southeastern mining area of the Chambishi Copper Mine is presented to demonstrate the effectiveness of the proposed model. The initial plan was generated using the multi-equipment task assignment model for the horizontal stripe pre-cut mining method. After equipment breakdown, the proposed model was used to reschedule the initial plan. Then, a comparative analysis was carried out. The results show that the proposed model effectively reduces the impact of equipment failures on production operations and improves overall mining execution at a low management cost. In general, the proposed model can assist schedulers in allocating equipment, coping with the disturbing effects of equipment failure, and improving mine production efficiency.

7 December 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
STSiyu Tu
Siyu Tu
MJMingtao Jia
Mingtao Jia
Liguan WangLiguan Wang
Liguan Wang
SFShuzhao Feng
Shuzhao Feng
SHShuang Huang
Shuang Huang
This paper proposes a multi-equipment task assignment model for the horizontal stripe pre-cut mining method to address the problem of cooperative scheduling operation of multi-equipment in underground metal mines under complex constraints. The model is constructed with multiple objectives, including operation time, operational efficiency, equipment utilization rate, and ore grade fluctuation by considering the constraints of time, space, equipment, and processes. The NSGA-III algorithm is used to obtain the solution. The effectiveness of the algorithm is tested based on the actual data from the Chambishi Copper Mine. The results show that the average equipment utilization rate is 51.25%, and the average ore output efficiency is 278.71 tons/hour. The NSGA-III algorithm can quickly generate the optimal multi-equipment task assignment solution. The solution reduces the interference of manual experience and theoretically improves the actual operation of the mine.