To address the issues of easy leakage and low sand-flushing efficiency of coiled tubing working fluid in shale gas horizontal wells, this study investigates the flow behavior of foam fluid in both the coiled tubing and the annulus during foam sand-flushing operations, and optimizes operational parameters to enhance sand-flushing efficiency. Considering the dynamic variations in foam fluid properties with temperature and pressure, secondary flow effects in the spiral section, annular eccentricity, wellbore trajectory, and the solid phase in sand-carrying fluid, a one-dimensional steady-state hydraulic model incorporating flow and heat transfer is developed for the entire wellbore. This model covers the spiral, straight, jet, and annular sections of coiled tubing. Using field data from an example well, simulations yield the pressure distribution along the foam circulation path, the total circulation time, and key operational parameters. The feasibility of coiled tubing foam sand-flushing in shale gas horizontal wells is demonstrated, and the optimization of operational parameters to improve sand-flushing efficiency is analyzed. The findings provide important guidance for parameter design and equipment selection for safe and efficient sand-flushing operations in shale gas horizontal wells.
Coiled tubing is subjected to internal-to-external pressure differentials and repeated bending during field operations, while ovalization and cumulative fatigue damage progressively compromise structural integrity. To address inconsistencies among pressure-capacity and fatigue models and the simplified treatment of ovality, three complementary calculations are performed. The nominal first-yield pressure of a circular tube is obtained using the von Mises criterion. The ovality-corrected collapse estimate is determined from cross-sectional area conservation and principal-axis equilibrium, while complete tripping cycles are predicted using an empirical equivalent-stress formulation and Miner’s rule. The methodological contribution is a coordinated engineering assessment in which nominal first yield, ovality-corrected collapse, and complete tripping-cycle life are distinguished and evaluated using consistent geometric, loading, and output definitions. Within the investigated parameter range, increasing yield strength from 483 to 758 MPa raised the calculated internal-pressure yield limit from 116.88 to 183.42 MPa. Increasing ovality from 0 to 0.02 reduced the calculated ovality-corrected collapse estimate from 122.44 to 77.03 MPa, while increasing internal pressure from 0 to 20 MPa reduced the predicted number of complete tripping cycles from 190 to 41. The results clarify the effects of material strength, geometry, pressure, and bending conditions and support model-based tubing selection, pressure management during bending, and segment-specific life assessment. Field operating limits should nevertheless be established using applicable standards, measured material properties, and full-scale tests on coiled tubing of the same specification.
Wellbore stability in deep fractured-vuggy carbonate gas reservoirs constrains drawdown management and completion selection. This study evaluates the Deng-2 Member of Well PT1 using a stage-specific workflow combining the Kirsch solution, Biot effective stress, depth-dependent log-derived parameters, and core tests at high temperature and confining pressure. The Mohr–Coulomb criterion is used for drilling and well testing; an inscribed-circle-matched Drucker–Prager criterion is used for production. Calculated profiles agree with Drillworks in overall trends, major high-risk intervals, and pressure-window positions. Caliper observations provide field comparisons within their depth coverage. At a mud density of 1.230 g/cm3, 5744–5745 m is locally susceptible to shear instability. Minimum allowable testing and production drawdowns both occur at 5744.62 m and are 4.95 and 43.75 MPa, respectively. Actual testing drawdown reaches its calculated limit, whereas actual production drawdown of 5.00 MPa is 38.75 MPa below the production limit. Completion design should prioritize this local weak interval. Subject to stability, isolation, and pressure-bearing requirements, open-hole multistage completion suits water-free intervals requiring differentiated stimulation; uncemented liners suit lost-circulation-sensitive intervals with limited staged stimulation; and cemented-and-perforated liners merit evaluation where water isolation or additional support is needed.