In oil and gas production, treatment and transportation technologies, gas hydrates cause serious problems associated with disruption of these technological processes. The traditional and most common method of combating gas hydrates in the oil and gas industry is the use of methanol as a hydrate inhibitor. The specific consumption indicators of methanol consumption as an inhibitor of the formation of gas hydrates directly depend on the composition of the extracted products, as well as on the technology for preparing the extracted products for transportation. Gas hydrates represent one of the major economic and safety problems in the oil and gas industry in the exploration, production, processing and transportation of gas and hydrocarbons. This article analyzes modern methods for methanol regeneration at oil and gas industry enterprises, and describes in detail the methods and parameters of processing plants that are used for the regeneration of water-methanol solutions. The advantages and disadvantages of advanced methods of water-methanol solutions regeneration are described. As a result of the review of existing technologies, the distillation method was determined to be the most preferable, as the most proven and widely used method today.
30 September 2026 in Kazakhstan journal for oil & gas industry
Background: The expiry of the design operating life of the production facilities at Field X requires an assessment of the cost-effectiveness of capital expenditures (CAPEX) and operating expenditures (OPEX) associated with the modernization of process facilities, as well as the development of recommendations for optimizing investment decisions, considering the forecast decline in production and the prospects for further field development. Aim: To assess capital and operating expenditures associated with the modernization of the Phase 2 process facilities in the post-contract period. Materials and methods: The study is based on data from the Field X Development Project and Field Development Analysis (FDA). As part of the work performed, a model of the main Units 1 and 2 was developed using QUE$TOR software to compare the cost of their potential replacement with the results presented in the previously approved project documentation. The modelling was performed based on the current production capacities of the units. Results: The option involving the extension of the production plateau using a single liquid hydrocarbon (LH) process train with a capacity of 2.8 million tonnes per year was selected as the most optimal, based on the duration of maintaining the production plateau duration (7 years). Reducing the wellhead pressure of Unit 3 wells from a high to a medium level had a significant impact on increasing LH production, extending the production plateau by an additional 5 years. Conclusion: The proposed concept was recognized as technically feasible and economically justified. Infrastructure optimization makes it possible to reduce capital expenditures by USD 2.97 billion, achieve additional LH production of approximately 8 million tonnes, extend the production plateau by 12 years, and extend the gas export period by 7 years.