This paper presents an analytical method for surrounding rocks in symmetrically shaped tunnels or roadways, with the symmetrical rise and fall of groundwater over a certain period. The influence of reservoir water level on wet–dry cycles were studied. The changes in the microstructure and strength of altered granite and its evolution were explored using mechanical tests and scanning electron microscopy (SEM). The results showed that: (1) the wet–dry cycles weakened the strength of altered granite. Furthermore, the uniaxial compressive strength, elastic modulus, cohesion, and internal friction angle decreased with the increase of the number of cycles, while the maximum reduction in these parameters reached 50.22%, 63.84%, 93.76%, and 53.90%, respectively. (2) The wet–dry cycles damaged the microstructure of altered granite. The SEM analysis showed that, under wet–dry cycles, the structure of altered granite changed from a smooth and integrated internal structure to the initiation, development, and expansion of pores and cracks. The porosity and fractal dimension of rock were determined using the SEM results. The degree of damage to altered granite under wet–dry cycles was quantitatively analyzed. (3) According to the rock mechanics strength tests and SEM and X-ray diffraction analyses, the damage mechanism of altered granite subjected to wet–dry cycles was discussed. The results provide the basis for a stability analysis of symmetrically shaped tunnels, especially symmetrical tunnels constructed in water-rich areas such as symmetric circular tunnels and symmetric horseshoe tunnels.
This paper presents a new statistical damage constitutive model using symmetric normal distribution. The broken rock microbody obeyed symmetric normal distribution and the equivalent strain principle in damage mechanics. The uniaxial compression tests of samples subjected to dry-wet cycles were performed. The damage model was established using the equivalent strain principle and symmetric normal distribution. The damage variable was defined by the elastic modulus under various dry-wet cycles. Parameters of the damage constitutive model were identified using MATLAB software, and the proposed model is verified to be in good agreement with uniaxial compression test results. Fracturing of the rock microbody is well described by symmetric normal distribution, and the proposed statistical damage constitutive model has good adaptability to the uniaxial compression stress-strain curve.
This paper presents new correlations for estimating the surrounding rock pressure of symmetrically shaped tunnels based on a symmetrical numerical model. Surrounding rock pressure is defined as the load acting on the support structure due to the deformation of the surrounding rock after tunnel excavation. Surrounding rock pressure is directly related to the selection of the lining structure and the determination of support parameters. The main challenge in designing and proceeding with the construction process is choosing a calculation method for the surrounding rock pressure for super-large sections, and this has been the focus of research among the tunnel research community. The excavation area of Liantang tunnel of Shenzhen Eastern Transit Expressway (China) is over 400 m2, making it the largest highway tunnel in the world so far. Based on this project, this paper analyses the applicability of various traditional methods of calculating the surrounding rock pressure for super-large section tunnels. In addition, based on the Tunneling Quality Index (Q), the factor of span is introduced into the method of calculating the surrounding rock pressure using the numerical simulation results of super-large symmetrical tunnels with different values of Q and different spans. Additionally, calculated correlations that could quickly estimate the surrounding rock pressure of tunnels are obtained. The comparison of surrounding rock pressures between the estimated and monitoring results of Liantang tunnel and more than 30 projects around the world effectively proves the rationality and universal applicability of the proposed correlations. This method could provide engineers and designers with a quick way to predict the surrounding rock pressure of deep super-large section underground structures during their design and construction stage.
The calculation of load and surrounding rock pressure of extra-large-section tunnels serves as an important premise for the design and construction of tunnel projects with extra-large sections. Based on the large-span section of the Shenzhen Liantang Tunnel (China), which is the largest highway tunnel in the world to date, this paper discusses the challenges existing in the calculation method of state load and surrounding rock pressure for extra-large-section tunnels and puts forward a novel calculation method for process load, which is suitable for extra-large-section highway tunnels. In the current work, we derived the related application correlations and improved the specific application steps, methods, and project models of the proposed calculation method. Both the rationality and feasibility of the calculation method were verified from a practical perspective by comparing the on-site data of surrounding rock pressure at the Liantang Tunnel with the calculated load, which provides a fundamental basis for the process design of tunnels.
As a kind of statically-indeterminate point-support structure, the irregular-plate bridge (IPB) is extremely sensitive to the settlement of pier columns, and the stress of the plate is complicated. Because of the limitation of environmental conditions, the newly-built subway circular symmetric shield tunnel needs to pass the pier foundation of the IPB perpendicularly. To control the engineering risks, the pier settlement value must be known, and measures should be taken to reduce the settlement. This paper takes the project of the Beijing subway circular symmetric shield tunnels passing the existing IPB of the Guang’anmen Bridge as an example. First, the stress characteristics and settlement control standards of the IPB are analyzed, and then the technical scheme of synchronous jacking and key points of risk control during the construction of the shield passing the IPB are put forward. The relationship between the excavation face pressure of the shield tunnel and pier foundation settlement, and the ground settlement, are then analyzed. Finally, structural cracking after construction is analyzed, and the analysis shows that synchronous jacking technology can effectively control the settlement value of the subway tunnel passing the IPB. The technology is a feasible method for controlling the safety of a tunnel passing through a sensitive, statically-indeterminate bridge, and this work is a successful experience for similar major risk projects.