This study investigates the integration of center-running Bus Rapid Transit within multi-lane turbo-roundabout geometries to resolve urban transit bottlenecks while maintaining vehicular capacity. Driven by the need to eliminate severe weaving conflicts and transit delays at complex junctions, we approached the problem by developing an integrated framework combining VISSIM micro-simulation, FHWA surrogate safety analytics, and active Transit Signal Priority algorithms. Our findings reveal that physical spiral lane segregation and dynamic signal control reduce general vehicle delay by 52.6%, cut BRT travel times from 58.2s to 31.4s, and decrease severe safety conflicts by over 80%. This work matters because it provides municipal planners with an economically viable, high-performance hybrid design that yields an annual economic savings of $1,502,600, balancing $10.0M–$23.8M capital expenditures against robust multi-vector operational gains. Ultimately, this research offers a comprehensive decision-making model for designing safe, sustainable, and fluid multi-modal urban intersections.
Combined sewer systems can discharge untreated combined sewer overflows (CSOs) during intense rainfall, while conventional storage tunnels require substantial capital investment and may disrupt urban traffic during construction. This study proposes an integrated modernization framework combining Non-dominated Sorting Genetic Algorithm II (NSGA-II)-based placement of roadside bioretention cells with real-time gate and pump control driven by a physics-informed machine-learning (PIML) surrogate. The surrogate incorporates the one-dimensional Saint-Venant mass- and momentum-conservation equations into its training objective. The framework was evaluated using an EPA SWMM 5.2-based benchmark catchment under 1-, 2-, 5-, and 10-year synthetic design storms. Against the supplied SWMM benchmark outputs, the PIML surrogate achieved a Nash–Sutcliffe efficiency (NSE) of 0.952 and a reported inference latency of 0.32 ms, compared with a mean SWMM runtime of 14.5 min. The integrated scenario reduced peak runoff from 48.2 to 19.6 m³/s (59.3%) and increased reported storage utilization from 42.0% to 94.5%. Simulated CSO discharge was reduced to zero for the 1-, 2-, and 5-year storms and from 210,000 to 12,400 m³ for the 10-year storm (94.1%). Road-waterlogging duration decreased from 4.2 to 0.3 h (92.9%). Using the cost components stated in the manuscript, baseline capital cost is $250 million and proposed capital cost is $20 million, corresponding to an estimated 92.0% reduction; regulatory penalties are excluded from capital expenditure. These are model-based estimates and require reproducible model files, cost documentation, and field validation before practical deployment.