Ridwan Anas

Prof. Dr. Ridwan Anas


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2021 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
RARidwan Anas
Ridwan Anas
RSRudi S Suyono
Rudi S Suyono
MSMedis S Surbakti
Medis S Surbakti
IHIka Puji Hastuty
Ika Puji Hastuty
Cost estimation of road construction is required at the early stages of a project used to describe the process of predicting a project’s cost before construction through the tender process. Unit cost for road construction has a different characteristic for each area, this is caused by the component that forms unit cost is different in each area, starting from the material, equipment to human resources. The unit cost of road construction is affected by several factors, such as project location, whereas the distance to the project location can affect the transportation cost of equipment and material, other than that there is an external cost for each road project. This study describes the variants of unit cost between the estimated cost and actual (contractual) cost, based on collected data for 62 awarded road construction projects during the last 3 years especially for major items of work in West Java Province. The result describes that cost under-estimates are more implemented than cost over-estimates in national road construction projects. The variances of unit cost can be used by the government as a reference for estimating the cost item because the high accuracy of unit cost is crucial for completing the road projects.

1 October 2019 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
ISI S Sembiring
I S Sembiring
RARidwan Anas
Ridwan Anas
Toll road infrastructure investment will affect the production sector, where the role of transportation is to be the logistics function of the manufacturing industry. The government policy based on the acceleration of toll road investment is expected to boost production performance. The local government is expected to provide support by increasing the economic potential of the region along with the policy. This research tends to describe the contribution of the toll road infrastructure investment in the Manufacturing Industry Sector in West Java Province. The empirical data result shows the difference of the significant efficiency level of the Manufacturing Industry Sector from connected district areas/cities compared to the areas that are not connected to the toll road (+ 6%). With the T-test Pair analysis, there is a significant difference against the value of efficiency level for the areas that are connected to the toll road from the Manufacturing Industry Sector once the Cipularang Toll Road begins to operate (+ 4%).

1 April 2022 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
RARidwan Anas
Ridwan Anas
MSMedis S Surbakti
Medis S Surbakti
IHIka Puji Hastuty
Ika Puji Hastuty
From an economic point of view, the high cost of freight transportation is indicated to increase the production of cost and weaken the industrial sector’s competitiveness. Indonesia’s logistic cost is the highest in Southeast Asia, which has absorbed more than 26% of the Gross Domestic Product (GDP). The operational costs of truck transportation, as the major freight transportation in Indonesia, is the highest compared to the operational cost of trucks in Vietnam, Thailand, Malaysia, and China. This paper introduces the issues related to the costs of inland freight transportation in Indonesia. The results show that high operational costs are caused by geographic, trip length, congestion, imbalance of freight movement, waiting time and the disutility of truck. Meanwhile, fuel consumption is a major component of the high transportation costs.

1 January 2021
Verified
Book Chapter
Closed access
PDF file
RARidwan Anas
Ridwan Anas
DDDimas B. E. Dharmowijoyo
Dimas B. E. Dharmowijoyo
NKNindyo C. Kresnanto
Nindyo C. Kresnanto

1 May 2020 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
RARidwan Anas
Ridwan Anas
ISIrwan S Sembiring
Irwan S Sembiring
IHIka Puji Hastuty
Ika Puji Hastuty
The government is obliged to provide road infrastructure inadequate supply of infrastructure, either to accelerate the regional economy. Due to the limited budget in efforts to fulfil road infrastructure, so the government carries out various policies to attract the private sector to invest in the road sector, especially toll roads. One of the parameters of toll road investment is related to the initial of toll rate to be applied, where toll rates are determined by saving in vehicle operating costs and value of time and considering the Ability to Pay and Willingness to Pay (ATP / WTP).This study aims to evaluate toll rates are set for the Medan-Binjai and Medan-Tebing Tinggi sections with BKBOK and ATP/WTP analysis, as a reference in the basic operation of the toll road.

20 March 2023 in Jurnal Syntax Transformation
Verified
Journal Article
Open access
PDF file
SMSarah Maghfirah
Sarah Maghfirah
RARidwan Anas
Ridwan Anas
EBEmma Patricia Bangun
Emma Patricia Bangun
The condition of road pavement is going to decrease during its service life. To keep a pavement functioning, maintenance must be continuously performed. However, the maintenance that has been carried out so far has not been carried out optimally because the budgeting system is still carried out annually based on the results of a road condition survey. The preparation of the budget is carried out annually by BBPJN SUMUT as the relevant stake holder, based on the FWD value with a back calculation program. This causes funding to become unsustainable so that it affects unsustainable handling as well. There are several methods for calculating predictions of future damage values ​​including IRMS-V3 and RONET. Both have a basis for calculating the value of IRI as the main variable in predicting damage. The purpose of this study is to use both methods and compare them to predict IRI values, traffic growth values, and also the remaining planned life values ​​in order to obtain a funding/budget planning scheme and the right type of treatment. The type of data used is secondary data sourced from North Sumatra BBPJN. The analysis is carried out by calculating the IRI value, traffic volume, and the remaining planned life for the next 5 years. Based on the results of the analysis obtained, road damage will occur more quickly using the RONET method. Road maintenance funds resulting from the IRMS-V3 method are more economical. Then validated using statistical t test. The results show that there is no difference in the average predicted IRI value, but there is a difference in the average predicted RSL value for the two methods