Zhenrui Yan

Prof. Dr. Zhenrui Yan


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 September 2026 in Buildings
Verified
Journal Article
Open access
PDF file
WZWu Zhang
Wu Zhang
ZYZhenrui Yan
Zhenrui Yan
QYQigong Yang
Qigong Yang
WHWang Hy
Wang Hy
PMPing Mu
Ping Mu
Early-age cracking of tunnel lining concrete under adverse curing threatens long-term durability. This study integrates material-scale testing, structural-scale testing, and multiscale simulation to investigate cracking behavior and prevention strategies. Material-scale experiments on self-compacting concrete (SCC) under three curing regimes and four demolding times (1–7 d) revealed that extending demolding time mitigated strength loss, with 28 d strength increasing by up to 22.3% under low-temperature curing. The DuCOM model predicted strength evolution with an average 28 d error of 2.5%. Structural-scale tests under laboratory ambient exposure (S1) and moisture-retaining curing (S2) showed that S1 specimens cracked at ~8 d when the stress-to-strength ratio exceeded 1.0, whereas S2 specimens remained crack-free. The coupled DuCOM–COM3D framework captured internal stress evolution with peak stress errors within 1.77% (S1) and 8.74% (S2). Based on the stress-to-strength ratio criterion as a preliminary indicator, three prevention measures are proposed: extending demolding time, immediate moisture-retaining curing, and real-time early warning. This quantitative framework provides a preliminary basis for early-age cracking risk assessment in the present experimental configuration.

5 November 2026 in Infrastructures
Verified
Journal Article
Open access
PDF file
ZYZhenrui Yan
Zhenrui Yan
YZYuqing Zhang
Yuqing Zhang
GYGuangliang Yao
Guangliang Yao
PSPengcheng Si
Pengcheng Si
XLXiaoke Li
Xiaoke Li
SZShunbo Zhao
Shunbo Zhao
A special measure of carriageway grooving in the prestressed concrete lining of a water delivery shield tunnel locally weakens the cross-section, raising issues concerning the safe operation of the tunnel under high internal water pressure and the treatment/repair of grooving. Based on an actual project, a 3D finite element model containing the surrounding rock, shield segment and prestressed concrete lining was established, and the numerical results were compared with field-monitoring results of the ungrooved section. Parametric analyses were carried out on the loading behavior of the prestressed concrete lining with different depths and widths of the groove at construction and water-filling stages, under the assumption of the maximum continuous longitudinal length of the groove corresponding to the length of a standard lining segment. Results indicate that groove depth mainly governs circumferential compressive-stress concentration in the outer layer beneath the groove, whereas groove width governs the inner-surface longitudinal tensile-stress threshold along the central line of the carriageway. When the depth and width of the groove are limited within the carriageway to maintain the ring integrity of the prestressed concrete lining, the maximum inner-surface tensile stresses are lower than the tensile strength of concrete at the construction stage, and the circumferential stresses remain compressive around the full ring at the water-filling stage.