Yike Wang

Mr. Yike Wang


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 November 2026 in Processes
Verified
Journal Article
Open access
PDF file
YTYuan Tian
Yuan Tian
GCGuolin Cai
Guolin Cai
HHHuirong Huang
Huirong Huang
MLMingyue Lei
Mingyue Lei
JZJian Zhang
Jian Zhang
ZYZheng Yang
Zheng Yang
Balancing separation efficiency and pressure loss is essential for sand removal at shale gas wellheads. A double-cone cyclone desander was investigated using numerical simulations coupling a Reynolds stress model with a discrete phase model, single-factor analysis, and an orthogonal design. Structural and operating parameters were evaluated, and field performance was compared across two 161-day operating periods before and after optimization. At an inlet velocity of 5 m/s, a particle-size range of 0.02–0.10 mm, and a particle mass flow rate of 0.26 kg/s, the selected configuration achieved a simulated separation efficiency of 87.0%, increasing by 17.5 percentage points over the initial configuration. Pressure drop remained nearly unchanged, from 934.4 to 928.4 Pa, while overall height decreased by 129 mm. Increasing inlet velocity reduced separation efficiency and increased pressure drop. Shifting the size range toward larger particles improved capture with little effect on pressure drop. Field desanding efficiency increased by 34.84–35.70 percentage points across corresponding stages; however, the nonconcurrent comparison cannot isolate the contribution of optimization. Structural optimization can therefore improve simulated separation performance with nearly unchanged pressure drop, whereas selecting operating velocity requires balancing throughput and separation efficiency.