Yue Yu

Dr. Yue Yu


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 October 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
YYYue Yu
Yue Yu
YPYifei Pan
Yifei Pan
CLChanggang Li
Changgang Li
SZShuolin Zhang
Shuolin Zhang
JZJingyi Zhang
Jingyi Zhang
LZLibo Zhang
Libo Zhang
Fractal geometry offers a natural language for the self-similarity and scale invariance of power networks, yet future receiving-end grids shaped by high renewable penetration, high load density and large HVDC infeed have no historical counterpart. This paper formalises the synthesis of such grids as a Constrained Fractal Iteration System (CFIS), in which synthetic topology is generated by the scale-progressive composition of three fractal operators, each coupling a spatial clustering/topology operator with an engineering constraint-projection operator. A hybrid metaheuristic realises the operators through dynamic-weighted K-means (DWK-Means), social-learning particle swarm optimisation (SL-PSO) and constraint-embedded 2-opt (CE-2-opt). On a provincial receiving-end grid at 162, 234 and 363 GW, the generated topologies are scale-invariant over a well-defined box-size range: the box-counting dimension rises from 1.675 to 1.800 with load and shows a clear voltage-layered hierarchy; the constrained dimension remains within 1.5% of the unconstrained value, showing that engineering feasibility costs almost no fractal quality. The 500 kV station set attains a correlation dimension of 1.81 versus 1.69 for the real existing grid, consistent with the interpretation of the synthetic grid as an idealised fractal upper bound. Short-circuit levels are brought within the 63 kA limit after correction, and renewable curtailment and load shedding remain zero; N-1 screening of all elements shows that the worst post-contingency loading falls from 324.7% at 162 GW to 141.1% at 363 GW. Against classical topology generators built on the same node set, the proposed backbone attains full degree-two redundancy and a comparable fractal dimension with about 24% less line length, and an ablation of the redundancy bound shows that it, rather than the short-circuit limit, governs steady-state security at the low load scale.

29 October 2026 in Fractal and Fractional
Verified
Journal Article
Open access
PDF file
YYYue Yu
Yue Yu
YPYifei Pan
Yifei Pan
CLChanggang Li
Changgang Li
SZShuolin Zhang
Shuolin Zhang
JZJingyi Zhang
Jingyi Zhang
LZLibo Zhang
Libo Zhang
Fractal geometry offers a natural language for the self-similarity and scale invariance of power networks, yet future receiving-end grids shaped by high renewable penetration, high load density and large HVDC infeed have no historical counterpart. This paper formalizes the synthesis of such grids as a Constrained Fractal Iteration System (CFIS), in which synthetic topology is generated by the scale-progressive composition of three fractal operators, each coupling a spatial clustering/topology operator with an engineering constraint-projection operator. A hybrid metaheuristic realizes the operators through dynamic-weighted K-means (DWK-Means), social-learning particle swarm optimization (SL-PSO) and constraint-embedded 2-opt (CE-2-opt). On a provincial receiving-end grid at 162, 234, and 363 GW, the generated topologies are scale-invariant over a well-defined box-size range: the box-counting dimension rises from 1.675 to 1.800 with load and shows a clear voltage-layered hierarchy; the constrained dimension remains within 1.5% of the unconstrained value, showing that engineering feasibility costs almost no fractal quality. The 500 kV station set attains a correlation dimension of 1.81 versus 1.69 for the real existing grid, consistent with the interpretation of the synthetic grid as an idealized fractal upper bound. Short-circuit levels are brought within the 63 kA limit after correction, and renewable curtailment and load shedding remain zero; N-1 screening of all elements shows that the worst post-contingency loading falls from 98.5% at 162 GW to 91.4% at 363 GW, satisfying the thermal limits under single contingencies. Against classical topology generators built on the same node set, the proposed backbone attains full degree-two redundancy and a comparable fractal dimension with about 24% less line length, and an ablation of the redundancy bound shows that it, rather than the short-circuit limit, governs steady-state security at the low load scale.