Ahmadreza Sayadi

Prof. Dr. Ahmadreza Sayadi


Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 April 2010 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
MMMasoud Monjezi
Masoud Monjezi
HDH. Dehghani
H. Dehghani
TST. N. Singh
T. N. Singh
ASAhmadreza Sayadi
Ahmadreza Sayadi
AGA. Gholinejad
A. Gholinejad


15 January 2018 in Environmental Earth Sciences
Verified
Journal Article
Closed access
PDF file
VVVahid Vaziri
Vahid Vaziri
JHJafar Khademi Hamidi
Jafar Khademi Hamidi
ASAhmadreza Sayadi
Ahmadreza Sayadi


17 July 2024 in Heliyon
Verified
Journal Article
Open access
AHAli Reza Zaker Hossein
Ali Reza Zaker Hossein
ASAhmadreza Sayadi
Ahmadreza Sayadi
MRMohammad Javad Rahimdel
Mohammad Javad Rahimdel
MMMohammad Reza Moradi
Mohammad Reza Moradi
Failures in mining machinery can abruptly halt mineral production and operations, emphasizing the indispensable role of humans in maintenance and repair operations. Addressing human errors is crucial for ensuring a safe and reliable system, particularly during maintenance activities where accidents frequently occur. This paper focuses on evaluating Human Reliability (HR) to enhance activity implementation effectiveness. Given the challenge of limited and uncertain data on human errors, this study aims to estimate the probability of human errors using Bayesian networks (BN) under uncertain parameters. Applying this approach to assess HR in the maintenance and repair operations of mining trucks at Golgohar Iron Ore Mine in Iran, the study identifies critical factors influencing error occurrence in a fuzzy environment. The results highlight key factors impacting human error and offer insights into estimating HR with minimal human intervention.

29 June 2012 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
ASAhmadreza Sayadi
Ahmadreza Sayadi
ALAli Lashgari
Ali Lashgari
MFMohammad Majid Fouladgar
Mohammad Majid Fouladgar
MSMiroslaw J. Skibniewski
Miroslaw J. Skibniewski
Material loading is one of the most critical operations in earthmoving projects. A number of different equipment is available for loading operations. Project managers should consider different technical and economic issues at the feasibility study stage and try to select the optimum type and size of equipment fleet, regarding the production needs and project specifications. The backhoe shovel is very popular for digging, loading and flattening tasks. Adequate cost estimation is one of the most critical tasks in feasibility studies of equipment fleet selection. This paper presents two different cost models for the preliminary and detailed feasibility study stages. These models estimate the capital and operating cost of backhoe shovels using uni-variable exponential regression (UVER) as well as multi-variable linear regression (MVLR), based on principal component analysis. The UVER cost model is suitable for quick cost estimation at the early stages of project evaluation, while the MVLR cost function, which is more detailed, can be useful for the feasibility study stage. Independent variables of MVLR include bucket size, digging depth, dump height, weight and power. Model evaluations show that these functions could be a credible tool for cost estimations in prefeasibility and feasibility studies of mining and construction projects.