Time-of-use (TOU) is an effective price-based demand response strategy. A reasonable design of TOU strategy can effectively reduce the peak-valley difference, and then produce a lot of benefits (such as delaying power grid investment, reducing interruption cost, and improving reliability). However, changing peak-valley period has a great influence on the peak-valley difference and power supply reliability of power system. Therefore, this paper aims to investigate the optimal modification of peak-valley period considering reliability loss under multiple TOU schemes. Firstly, this paper presents a clustering model and algorithm of optimal load curve based on a minimum error iteration method. Secondly, an optimal modification of peak-valley period based on a dynamic load point method is proposed, and the traditional peak-valley difference is replaced by the global peak-valley difference to calculate the objective function. Thirdly, this paper establishes a load–reliability relation fitting model based on the back propagation neural network. Finally, the effectiveness and correctness of the proposed method are investigated by the Roy Billinton test system and reliability test system.
The traditional method of searching transmission section generally has the problem of omission and time-consuming. A topology converging algorithm of power grid adjacency matrix is proposed in this paper. It aggregates neighboring buses based on a simple matrix transformation rule, and identify key transmission sections based on matrix operations and power flow distribution factors. This method has the advantage of no presetting the sub-zone, which can avoid the simplification of the grid topology in the sub-zone and improve the calculation accuracy. The complex logical operations of the traversal algorithm adopted by most of traditional methods can be avoided, and the calculation speed can be effectively improved. Besides, the algorithm also has a memory characteristic which can be applied to the online search of key transmission sections. The results of several IEEE test systems show the effectiveness of the proposed algorithm.
28 April 2026 in International Journal of Electrical Power & Energy Systems
With the rapid development of bulk power grid under extra-high voltage (EHV) AC/DC hybrid power system and extensive access of distributed energy resources (DER), operation characteristics of power grid have become increasingly complicated. To cope with new severe challenges faced by safe operation of interconnected bulk power grids, an in-depth analysis of bulk power grid security defense system under the background of EHV and new energy resources was implemented from aspects of management and technology in this paper. Supported by big data and cloud computing, bulk power grid security defense system was divided into two parts: one is the prevention and control of operation risks. Power grid risks are eliminated and influence of random faults is reduced through measures such as network planning, power-cut scheme, risk pre-warning, equipment status monitoring, voltage control, frequency control and adjustment of operating mode. The other is the fault recovery control. By updating “three defense lines”, intelligent relay protection is used to deal with the challenges brought by EHV AC/DC hybrid grid and new energy resources. And then security defense system featured by passive defense is promoted to active type power grid security defense system.