This study focuses on a production scheduling problem in which the products constituting the items of an order can be manufactured on multiple machines and can only be sold as complete sets. A key characteristic of set-based sales is that the completion of individual components alone is insufficient, since an order is considered fulfilled only when the entire set is available. This requirement significantly increases the complexity of classical scheduling problems. The aim of the research is to develop a model in which early completion is rewarded, while delays are penalized.