The roof of large-section underground opening intersections in soft argillaceous rock is prone to separation and instability due to stress concentration. Its stability is pivotal to sustainable, safe mining in underground coal mines. Laboratory experimentation, numerical simulations, industrial trials, and field measurements were conducted to reveal the roof separation mechanism at the large-section intersection of the main drainage pump opening in soft argillaceous rock under high stress at Libi Coal Mine and to study stability control countermeasures. The main influencing factors of roof separation at the large-section intersection in the main drainage pump opening include soft argillaceous rock with low strength, high in situ stress, tunneling disturbance from the roadway group, and large sections. According to the numerical simulation, fissure development in the roof of the large-section intersection is mainly concentrated in the shallow surrounding rock, and fissures in the deep surrounding rock are not well developed, which is consistent with the borehole image monitoring results. The complex stress concentration environment under multiple factors leads to roof separation in the large-section intersection. The combined schemes of prestressed cables and grouting reinforcement are implemented to control separation in the large-section intersection. Field measurements indicate that these reinforcement schemes can effectively ensure the safety and stability of the large-section intersection in soft argillaceous rock under high stress.