An approach to estimate both the reliability index β and its complement, the probability of failure, through closed-form expressions that consider aleatory and epistemic uncertainties, is proposed. Alternatively, exceedance demand rates are obtained based on simplified expressions and numerical integration. Reliability indicators are calculated, considering the uncertainties in the compressive strength of concrete, steel yield, and section geometry, together with the aleatory uncertainties related to seismic loadings. Such indicators are estimated in a continuous RC bridge located in Acapulco, Guerrero, Mexico. The bridge was designed to comply with a drift of 0.004. Exceedance demand rates for drift thresholds from 0.001 to 0.012 are estimated, and maximum differences of 5.5% are found between the closed-form expression and numerical integration. The exceedance demand rate expressed by means of its inverse, the return period, indicates that the serviceability limit state is exceeded after 58 years of the bridge construction. The reliability index decreases by about 1.66%, and the probability of failure increases by about 16.1% when the epistemic uncertainties are considered. The approach shows the importance of epistemic uncertainties in the estimation of reliability indicators.
Offshore facilities are essential infrastructure systems for many nations because their partial or total interruption causes diverse consequences in the economic, political, environmental, and social sectors. With the aim to preserve such structures at acceptable reliability levels, an approach is proposed to calculate the optimal instant of time in which inspection and maintenance works can be performed. The optimal time instant is estimated following the cost benefit criterion (CB) considering the cost of inspection, repair and failure. The inspection cost is given by an inspection quality, while fatigue crack size at different critical joints is calculated to estimate repair costs. In this paper, the concept of demand exceedance rates is introduced to evaluate the failure cost. Uncertainties related to both storm and operational waves are considered. The optimal time instant is associated with the lowest cost of inspection, repair and failure. For this purpose, the approach is exemplified in an offshore jacket structure situated in the Gulf of Mexico. The optimal instant of time corresponds to 6 years after the offshore jacket installation. If maintenance actions are implemented every six years during the lifespan of the system, an economic reduction of 58% is achieved, compared to the case in which no inspection and maintenance works are performed over time. The approach helps decision-makers ensure the best use of economic resources.