Georgios Koulinas

Dr. Georgios Koulinas

Department of Production and Management Engineering, Democritus University of Thrace, 12 Vas. Sofias st., 67100 Xanthi, Greece
orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2020 in Journal of Manufacturing Systems
Verified
Journal Article
Closed access
PPPanagiotis D. Paraschos
Panagiotis D. Paraschos
Georgios KoulinasGeorgios Koulinas
Georgios Koulinas
DKDimitrios E. Koulouriotis
Dimitrios E. Koulouriotis

23 July 2020 in Buildings
Verified
Journal Article
Open access
PDF file
Georgios KoulinasGeorgios Koulinas
Georgios Koulinas
Alexandros XanthopoulosAlexandros Xanthopoulos
Alexandros Xanthopoulos
TTThomas Tsilipiras
Thomas Tsilipiras
Dimitrios KoulouriotisDimitrios Koulouriotis
Dimitrios Koulouriotis
In this paper, we present a simulation-based approach for effectively estimating delay risks in project schedules and predicting the possibilities of in-time project completion for various deadlines. The main contribution of this study is the development of a novel approach for duration risk quantification, which uses a newly introduced equation for total risk estimation regarding activities’ durations, and quantifying the manager’s experience as expressed through a questionnaire. In addition, the proposed approach integrates these preferences into a simulation-based framework used for estimating the activities’ durations variation and predicting the actual project duration with more accuracy. Furthermore, using different distributions according to each activity characteristic supports decision making from a wide range of experts, from risk-averse to risk-seeking managers. The proposed method was applied to estimate the total project completion time of a complicated hotel renovation project and the possibility for the project to be delivered within an imposed deadline. The promising results in comparison to the classic PERT method proved that this process can better express the uncertainty and provide project risk managers with better predictions when estimating budget and time-critical overruns under lack of knowledge and historical data.

24 January 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
Georgios KoulinasGeorgios Koulinas
Georgios Koulinas
ODOlympia E. Demesouka
Olympia E. Demesouka
Panagiotis K. MarhavilasPanagiotis K. Marhavilas
Panagiotis K. Marhavilas
AVAthanasios P. Vavatsikos
Athanasios P. Vavatsikos
Dimitrios KoulouriotisDimitrios Koulouriotis
Dimitrios Koulouriotis
In this study, we propose a safety risk assessment process using the fuzzy extension of the technique for order of preference by similarity to ideal solution (TOPSIS) for assigning priorities to risks in worksites, in order to promote the health, safety and well-being of workers, issues that are embedded within the concept of sustainability, specifically belonging to the social sphere of sustainability. The multicriteria method works in cooperation with a simple quantitative risk analysis and assessment process, the proportional risk assessment technique (PRAT), the functionality of which is based on real data. The efficiency of this approach is validated through treating a construction project example in Greece, and the results are compared with real fatal and non-fatal accidents data for the years 2014–2016. This integrated multicriteria approach can be used by risk managers as a tool for assessing safety risks and making informed decisions about the manner that a constraint budget would be spent in order to maximize health and safety in workplace.

1 August 2021 in Renewable Energy
Verified
Journal Article
Closed access
Ioannis E KosmadakisIoannis E Kosmadakis
Ioannis E Kosmadakis
CECostas Elmasides
Costas Elmasides
Georgios KoulinasGeorgios Koulinas
Georgios Koulinas
Konstantinos P. TsagarakisKonstantinos P. Tsagarakis
Konstantinos P. Tsagarakis

1 July 2012 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Georgios KoulinasGeorgios Koulinas
Georgios Koulinas
KAKonstantinos P. Anagnostopoulos
Konstantinos P. Anagnostopoulos
In this study we propose a threshold accepting based hyperheuristic for solving in a single run both the resource-constrained project scheduling problem or resource allocation, and the resource leveling problem. Having their roots in the field of artificial intelligence, hyperheuristics operate in the “low-level” heuristics domain rather than in the solutions domain. The hyperheuristic has been implemented within a commercial project management software package. Low-level heuristics operate on the solution domain defined by the priority values that the software uses for resource allocation. A case example from the literature and computational experiments on randomly generated projects demonstrate that the hyperheuristic achieves good performance in a timely manner, improving the results provided by the software.

30 January 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Panagiotis K. MarhavilasPanagiotis K. Marhavilas
Panagiotis K. Marhavilas
MFMichail Filippidis
Michail Filippidis
Georgios KoulinasGeorgios Koulinas
Georgios Koulinas
Dimitrios KoulouriotisDimitrios Koulouriotis
Dimitrios Koulouriotis
A joint-analysis by the use of (i) the multi-criteria decision-making (MCDM) technique of Typical-Analytical-Hierarchy-Process (T_AHP) and Fuzzy-Analytical-Hierarchy-Process (F_AHP) with (ii) the Hazard and Operability (HAZOP) method respectively, was conducted in a sour-crude-oil process industry (SCOPI), focusing on the deviations with economic/health/environmental impact. Consequently, the intention of this paper is dual; that means the first one is the presentation and application of the traditional HAZOP method on a SCOPI, and the second one the illustration and usage of the combined HAZOP_TAHP/FAHP framework in the previous referred industry, via the resulted hazards with economical, health and also environmental impacts, unveiling the sustainable dimension of this approach. The choice of the particular SCOPI for executing the HAZOP process is greatly powerful for the implementation of this approach, due to the plentiful hazards that the process includes, and due to its sophisticated design, as well. Originally, the conventional HAZOP study was carried out for finding out the potential destructive causes of abnormal circumstances in the SCOPI’s establishment. Subsequently, the defined (by HAZOP) hazards with particular economic, health and environmental impacts were elaborated by the T_AHP and F_AHP techniques in order to broaden the HAZOP results and prioritize the risks in the worksite of the SCOPI. It is worthwhile mentioning that this joint-analysis can afford a reliable base to enhance procedure safety and upgrade the occupational health safety’s level (OHS). Likewise, it might be a constructive means for the decision-makers to: (i) evaluate the urgent situation of the restricted resources’ investment, in measures of preventing particular deviations (like the ones with economical, health and environmental consequences), and (ii) to endorse the sustainable growth of this industry, taking into account that a significant part of literature utilized the issue of sustainability as a frame for the development of OHS RAA techniques.