Yi Zhu

Dr. Yi Zhu

orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 July 2022 in Information and Software Technology
Verified
Journal Article
Closed access
YGYuxiang Gao
Yuxiang Gao
YZYi Zhu
Yi Zhu
YZYu Zhao
Yu Zhao

17 February 2022 in Symmetry
Verified
Journal Article
Open access
PDF file
YZYu Zhao
Yu Zhao
YZYi Zhu
Yi Zhu
QYQiao YU
Qiao YU
XCXiaoying Chen
Xiaoying Chen
Software testing is the main method for finding software defects at present, and symmetric testing and other methods have been widely used, but these testing methods will cause a lot of waste of resources. Software defect prediction methods can reasonably allocate testing resources by predicting the defect tendency of software modules. Cross-project defect prediction methods have huge advantages when faced with missing datasets. However, most cross-project defect prediction methods are designed based on the settings of a single source project and a single target project. As the number of public datasets continues to grow, the number of source projects and defect information is increasing. Therefore, in the case of multi-source projects, this paper explores the problems existing when using multi-source projects for defect prediction. There are two problems. First, in practice, it is not possible to know in advance which source project is used to build the model to obtain the best prediction performance. Second, if an inappropriate source project is used in the experiment to build the model, it can lead to lower performance issues. According to the problems found in the experiment, the paper proposed a multi-source-based cross-project defect prediction method MSCPDP. Experimental results on the AEEEM dataset and PROMISE dataset show that the proposed MSCPDP method effectively solves the above two problems and outperforms most of the current state-of-art cross-project defect prediction methods on F1 and AUC. Compared with the six cross-project defect prediction methods, the F1 median is improved by 3.51%, 3.92%, 36.06%, 0.49%, 17.05%, and 9.49%, and the ACU median is improved by −3.42%, 8.78%, 0.96%, −2.21%, −7.94%, and 5.13%.

16 August 2016 in Software: Practice and Experience
Verified
Journal Article
Closed access
PDF file
YZYi Zhu
Yi Zhu
ZHZhiqiu Huang
Zhiqiu Huang
HZHang Zhou
Hang Zhou

1 January 2023 in IET Software
Verified
Journal Article
Open access
PDF file
YZYu Zhao
Yu Zhao
ZHZhiqiu Huang
Zhiqiu Huang
LGLina Gong
Lina Gong
YZYi Zhu
Yi Zhu
QYQiao YU
Qiao YU
YGYuxiang Gao
Yuxiang Gao
The performance of software defect prediction (SDP) models determines the priority of test resource allocation. Researchers also use interpretability techniques to gain empirical knowledge about software quality from SDP models. However, SDP methods designed in the past research rarely consider the impact of data transformation methods, simple but commonly used preprocessing techniques, on the performance and interpretability of SDP models. Therefore, in this paper, we investigate the impact of three data transformation methods (Log, Minmax, and Z ‐score) on the performance and interpretability of SDP models. Through empirical research on (i) six classification techniques (random forest, decision tree, logistic regression, Naive Bayes, K‐nearest neighbors, and multilayer perceptron), (ii) six performance evaluation indicators (Accuracy, Precision, Recall, F1, MCC, and AUC), (iii) two interpretable methods (permutation and SHAP), (iv) two feature importance measures (Top‐ k feature rank overlap and difference), and (v) three datasets (Promise, Relink, and AEEEM), our results show that the data transformation methods can significantly improve the performance of the SDP models and greatly affect the variation of the most important features. Specifically, the impact of data transformation methods on the performance and interpretability of SDP models depends on the classification techniques and evaluation indicators. We observe that log transformation improves NB model performance by 7%–61% on the other five indicators with a 5% drop in Precision. Minmax and Z ‐score transformation improves NB model performance by 2%–9% across all indicators. However, all three transformation methods lead to substantial changes in the Top‐5 important feature ranks, with differences exceeding 2 in 40%–80% of cases (detailed results available in the main content). Based on our findings, we recommend that (1) considering the impact of data transformation methods on model performance and interpretability when designing SDP approaches as transformations can improve model accuracy, and potentially obscure important features, which lead to challenges in interpretation, (2) conducting comparative experiments with and without the transformations to validate the effectiveness of proposed methods which are designed to improve the prediction performance, and (3) tracking changes in the most important features before and after applying data transformation methods to ensure precise and traceable interpretability conclusions to gain insights. Our study reminds researchers and practitioners of the need for comprehensive considerations even when using other similar simple data processing methods.

20 August 2021 in Future Internet
Verified
Journal Article
Open access
PDF file
YZYu Zhao
Yu Zhao
YZYi Zhu
Yi Zhu
QYQiao YU
Qiao YU
XCXiaoying Chen
Xiaoying Chen
Traditional research methods in software defect prediction use part of the data in the same project to train the defect prediction model and predict the defect label of the remaining part of the data. However, in the practical realm of software development, the software project that needs to be predicted is generally a brand new software project, and there is not enough labeled data to build a defect prediction model; therefore, traditional methods are no longer applicable. Cross-project defect prediction uses the labeled data of the same type of project similar to the target project to build the defect prediction model, so as to solve the problem of data loss in traditional methods. However, the difference in data distribution between the same type of project and the target project reduces the performance of defect prediction. To solve this problem, this paper proposes a cross-project defect prediction method based on manifold feature transformation. This method transforms the original feature space of the project into a manifold space, then reduces the difference in data distribution of the transformed source project and the transformed target project in the manifold space, and finally uses the transformed source project to train a naive Bayes prediction model with better performance. A comparative experiment was carried out using the Relink dataset and the AEEEM dataset. The experimental results show that compared with the benchmark method and several cross-project defect prediction methods, the proposed method effectively reduces the difference in data distribution between the source project and the target project, and obtains a higher F1 value, which is an indicator commonly used to measure the performance of the two-class model.

8 May 2023 in Engineering Reports
Verified
Journal Article
Open access
ZHZhixi Hu
Zhixi Hu
YZYi Zhu
Yi Zhu
With the continuous development of Internet technology, the role of software in life is increasing, and software defect prediction (SDP) is a key means to ensure software reliability. SDP is to predict the modules that may have defects in advance based on the historical data of software projects, and its purpose is to maximize the use of testing resources. However, in the actual development process, the project that needs to be predicted is often a new project for which there is little or no historical data. Therefore, how to use the massive data of other related projects to build a cross‐project software defect prediction (CPDP) model has received extensive attention from scholars. However, due to the differences in data distribution and class imbalance between different projects, the performance of CPDP is greatly affected. Therefore, on the basis of CPDP, this article proposes a feature selection method based on genetic algorithm (genetic algorithm feature selection, GAFS). GAFS mainly includes two stages: feature selection and ensemble training. In the feature selection stage, this article proposes a global search adaptive feature selection method based on genetic algorithm, which uses the integrated training results of candidate feature subsets on target data to migrate the optimal feature subset. In the ensemble training phase, the EasyEnsemble method is used to alleviate the class imbalance problem, multiple naive Bayesian classifiers are constructed, and then the final model is constructed through ensemble learning. In this article, F1‐score and MCC are used as the test indicator, and comparative experiments are carried out on AEEEM and Promise. The results show that compared with the five comparison methods, GAFS can improve the average F1‐score and MCC much more. For example, GAFS can improve the average F1‐score value by 38.9%, 31.6%, 35.1%, 22.0%, and 31.6%, respectively. In most cases, it can effectively improve the performance of the model and achieve better prediction results.