Paul Goodrum

Dr. Paul Goodrum


Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2018 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PGPouya Gholizadeh
Pouya Gholizadeh
Behzad EsmaeiliBehzad Esmaeili
Behzad Esmaeili
PGPaul Goodrum
Paul Goodrum
While advances in information and communication technologies (ICTs) have enabled architects, engineers, and contractors to reduce project time and cost and to improve quality, the diffusion of ICTs has typically been very slow in the construction industry. However, building information modeling (BIM) has overcome this diffusion challenge and has revolutionized such common practices as shifting the design process from two-dimensional (2D) drafting toward three-dimensional (3D) design, automated quantity takeoffs, and clash detection; such success marks the relevance of this technology for studying how technological innovations spread throughout the construction industry. Although some studies have explored BIM adoption, investigations using diffusion models to study the diffusion patterns of different BIM functions (e.g., 3D visualization, clash detection, energy modeling) are missing from the current literature. To fill this gap, this study uses reliable innovation diffusion models to describe the diffusion patterns of various BIM functions in the U.S. construction industry. Specifically, this study developed and sent a comprehensive questionnaire to 3,017 owner representatives, architects, and project managers; 118 individuals responded to the survey, of whom 81 are BIM users. The three most widely adopted BIM functions were 3D visualization, clash detection, and constructability analysis; the least frequently implemented functions were code validation; material tracking, delivery, and management; facility management; and energy analysis. Using these responses, this study analyzed the diffusion patterns of the BIM functions using four innovation diffusion models: internal (logistic), external, Bass, and Gompertz. Using such measures as Akaike’s information criterion (AIC) and variants of it, this study identified the Bass model as having the highest explanatory power for diffusion and determined that internal factors (e.g., imitation and bandwagon pressure) have the most influence on adoption rates of BIM functions. Furthermore, the diffusion models showed that the shop-drawing process and facility management functions had the lowest saturation rate in 2014 (below 50%) but have a greater potential for being adopted in coming years. The findings of this study advance knowledge for both researchers and practitioners regarding the adoption process of different BIM functions and provide a theoretical basis for understanding the diffusion patterns of ICT innovations in the construction industry.

1 December 2012 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
TTTimothy R. B. Taylor
Timothy R. B. Taylor
MUMoin Uddin
Moin Uddin
PGPaul Goodrum
Paul Goodrum
AMAlex McCoy
Alex McCoy
YSYongwei Shan
Yongwei Shan
Although change orders occur on many construction projects, data examined in this paper suggest that many change orders can be avoided on roadway construction projects through improved project planning and scoping. Statistical analyses of change orders on 610 Kentucky roadway construction projects from 2005–2008 examined how the causes of change orders varied between construction versus maintenance projects, different road types (e.g., state highways, interstate, and county roads), and construction type (e.g., earth work, structures, and road surfacing). The research examined the risk posed by engineering change orders by measuring the frequency and average percentage change in project costs for different types of change orders. Although the relative impacts did vary by analyses, the leading causes of change orders within the state consistently included contract omissions, owner-induced enhancements, and contract item overrun. The paper’s primary contribution to the overall body of knowledge is th...

22 January 2019 in Buildings
Verified
Journal Article
Open access
PDF file
AVAntoine Verghote
Antoine Verghote
SASara Al-Haddad
Sara Al-Haddad
PGPaul Goodrum
Paul Goodrum
SESylvie Van Emelen
Sylvie Van Emelen
Buildings with spatially complex interiors poise unique challenges during operations and maintenance. A complex interior makes wayfinding difficult, which can inhibit daily occupants from finding their desired location. Additionally, it can hamper emergency responders and evacuations during extreme emergency events. An experiment was conducted to analyze the effects of different information formats and spatial cognition on individual wayfinding in unknown environments. Participants were asked to memorize either a set of two-dimensional (2D) drawings or a three-dimensional (3D) model before navigating through a series of checkpoints in an unfamiliar environment. Individual wayfinding is dependent on an individual’s use of route knowledge or survey knowledge. Route knowledge was assessed from the start of the route to Checkpoint A (i.e., the first checkpoint). Meanwhile, survey knowledge was assessed from Checkpoint A to Checkpoint B. Spatial cognition of participants was measured by administering the card rotation and cube comparison tests. The research found that 3D models have a beneficial impact on the success of individual wayfinding. Furthermore, the success rate of the participants with a low spatial cognition improved significantly when using a 3D model rather than a set of 2D drawings. However, the success rates of participants with a high spatial cognition were not affected by the format of information. While the above results are significant, more experimentation is needed to confirm whether 3D information does effectively lower cognitive demand.

1 June 2016 in Journal of Infrastructure Systems
Verified
Journal Article
Closed access
HNHassan Nasir
Hassan Nasir
CHCarl T. Haas
Carl T. Haas
CCCarlos H. Caldas
Carlos H. Caldas
PGPaul Goodrum
Paul Goodrum
Productivity and project performance can be improved through implementing best practices. This paper describes the development of a best productivity practices implementation index (BPPII) for infrastructure projects. The index is a checklist of practices that are considered to have a positive influence on labor productivity at the project level for infrastructure projects. These practices have been grouped together into a formalized set of categories, sections, and elements. Each practice and its planning and implementation levels were defined and assigned a relative weight on the basis of its importance in affecting labor productivity. The productivity factor (PF), defined as a ratio of estimated productivity and actual productivity, was used as a metric to collect information about labor productivity to validate the accuracy of the BPPII for infrastructure projects. Data were collected for infrastructure projects in regards to their planning and implementation level of practices in addition to ...

1 September 2016 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PGPaul Goodrum
Paul Goodrum
JMJeffrey Miller
Jeffrey Miller
JSJohn Sweany
John Sweany
OAOmar Alruwaythi
Omar Alruwaythi
A series of field trials with pipefitters in North America was conducted to explore how their spatial cognition influenced their performance on a scale model assembly task. Participants were provided one of three information formats, traditional, two-dimensional (2D) isometric drawings, 2D isometric drawings supplemented with a 2D visual rendering of a three-dimensional (3D) image of the assembly, and 2D isometric drawings supplemented with a 3D physical model of the assembly. Card rotation and cube comparison tests were administered to measure spatial cognition. This paper’s primary contribution centers around the discovery that individual spatial cognition significantly influenced the pipefitter’s performance, but the format of information can neutralize the effect. Both the information format and spatial cognition significantly influenced performance. When only 2D information was provided, participants with relatively low spatial cognition performed significantly worse than participants with re...

1 July 2014 in Buildings
Verified
Journal Article
Open access
PDF file
YSYongwei Shan
Yongwei Shan
PGPaul Goodrum
Paul Goodrum
Steel construction activities are often undertaken in an environment with limited climate control. Both hot and cold temperatures can physically and psychologically affect construction workers, thus decreasing their productivity. Temperature and humidity are two factors that constantly exert forces on workers and influence their performance and efficiency. Previous studies have established a relationship between labor productivity and temperature and humidity. This research is built on the existing body of knowledge and develops a framework of integrating building information modeling (BIM) with a lower level critical path method (CPM) schedule to simulate the overall impact of temperature and humidity on a healthcare facility’s structural steel installation project in terms of total man hours required to build the project. This research effort utilized historical weather data of four cities across the U.S., with each city having workable seasons year-round and conducted a baseline assessment to test if various project starting dates and locations could significantly impact the project’s schedule performance. It was found that both varied project start dates and locations can significantly contribute to the difference in the man hours required to build the model project and that the project start date and location can have an interaction effect. This study contributes to the overall body of knowledge by providing a framework that can help practitioners better understand the overall impact of a productivity influencing factor at a project level, in order to facilitate better decision making.