This paper presents an assessment of the cost performance of CO2 capture technologies when retrofitted to a cement plant: MEA-based absorption, oxyfuel, chilled ammonia-based absorption (Chilled Ammonia Process), membrane-assisted CO2 liquefaction, and calcium looping. While the technical basis for this study is presented in Part 1 of this paper series, this work presents a comprehensive techno-economic analysis of these CO2 capture technologies based on a capital and operating costs evaluation for retrofit in a cement plant. The cost of the cement plant product, clinker, is shown to increase with 49 to 92% compared to the cost of clinker without capture. The cost of CO2 avoided is between 42 €/tCO2 (for the oxyfuel-based capture process) and 84 €/tCO2 (for the membrane-based assisted liquefaction capture process), while the reference MEA-based absorption capture technology has a cost of 80 €/tCO2. Notably, the cost figures depend strongly on factors such as steam source, electricity mix, electricity price, fuel price and plant-specific characteristics. Hence, this confirms the conclusion of the technical evaluation in Part 1 that for final selection of CO2 capture technology at a specific plant, a plant-specific techno-economic evaluation should be performed, also considering more practical considerations.
A technical evaluation of CO2 capture technologies when retrofitted to a cement plant is performed. The investigated technologies are the oxyfuel process, the chilled ammonia process, membrane-assisted CO2 liquefaction, and the calcium looping process with tail-end and integrated configurations. For comparison, absorption with monoethanolamine (MEA) is used as reference technology. The focus of the evaluation is on emission abatement, energy performance, and retrofitability. All the investigated technologies perform better than the reference both in terms of emission abatement and energy consumption. The equivalent CO2 avoided are 73–90%, while it is 64% for MEA, considering the average EU-28 electricity mix. The specific primary energy consumption for CO2 avoided is 1.63–4.07 MJ/kg CO2, compared to 7.08 MJ/kg CO2 for MEA. The calcium looping technologies have the highest emission abatement potential, while the oxyfuel process has the best energy performance. When it comes to retrofitability, the post-combustion technologies show significant advantages compared to the oxyfuel and to the integrated calcium looping technologies. Furthermore, the performance of the individual technologies shows strong dependencies on site-specific and plant-specific factors. Therefore, rather than identifying one single best technology, it is emphasized that CO2 capture in the cement industry should be performed with a portfolio of capture technologies, where the preferred choice for each specific plant depends on local factors.
1 March 2019 in International Journal of Greenhouse Gas Control
In this work, the integration of Calcium looping (CaL) process into a cement plant for post-combustion CO2capture is assessed via process simulations. In the proposed scheme, the carbonator of the CaL process is used as an end-of-pipe unit to capture the CO2from the cement kiln gas. From the results obtained, it is demonstrated that CO2capture efficiencies of the order of 90% are achievable, with CaL reactors operating in conditions not far from those demonstrated for application in power plants. The integration of the tail-end CaL process results in a significant increase of the total fuel consumption (about two to three times higher) compared to the benchmark cement plant without CO2capture. On the other hand, the heat from the CaL process can be recovered by a steam cycle producing decarbonized electric power that may exceed the needs of the plant auxiliaries (including the ASU and the CO2compression and purification unit), exporting in this way electricity to the grid and so resulting in CO2emission credits from a life cycle perspective. The resulting specific primary energy consumption for CO2avoided (SPECCA) highly depends on the reference power generation technology considered, and it ranges between 2.7 and 3.7 MJLHV/kgCO2in a coal-fired power generation scenario. As for the retrofittability of existing cement plants, the operation of the suspension preheating tower after the implementation of the CaL unit, as well as the position of the CaL carbonator with respect to the raw mill, have been assessed. Based on the results obtained, no critical issues have been found from a technical point of view in the adoption of the tail-end CaL process in existing cement kilns
1 February 2022 in International Journal of Greenhouse Gas Control