Thomas Olofsson

Prof. Thomas Olofsson

Umeå University
orcid

Research Focus & Metrics

Academic Career Length

30Years (1997-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2016 in Energy and Buildings
Verified
Journal Article
Closed access
FSFarshid Shadram
Farshid Shadram
TJTim Johansson
Tim Johansson
WLWeizhuo Lu
Weizhuo Lu
JSJutta Schade
Jutta Schade
Thomas OlofssonThomas Olofsson
Thomas Olofsson

15 November 2023 in Renewable Energy
Verified
Journal Article
Open access
BLBokai Liu
Bokai Liu
YWYizheng Wang
Yizheng Wang
TRTimon Rabczuk
Timon Rabczuk
Thomas OlofssonThomas Olofsson
Thomas Olofsson
WLWeizhuo Lu
Weizhuo Lu

10 August 2010 in Supply Chain Management: An International Journal
Verified
Journal Article
Closed access
PDF file
Anders SegerstedtAnders Segerstedt
Anders Segerstedt
Thomas OlofssonThomas Olofsson
Thomas Olofsson
Purpose – The purpose of this paper is to introduce a special issue about the construction industry and the management of its supply chains. It aims to discuss and point to some differences and possible similarities with traditional manufacturing and its supply chains. Design/methodology/approach – The paper is mostly a literature review and contains official statistics. Findings – The market of the construction company is mostly local and highly volatile. The long durability of the construction “product” contributes to the volatility. The product specification process before the customer order arrives shows different degrees of specifications: engineer to order, modify to order, configure to order, select a variant. (The common make-to-stock in traditional manufacturing does not exist.) A construction company only executes a small part of the project by its own personnel and capacity. This is a way of risk spreading and risk mitigation and to compensate for an unstable market. If a construction company wants to establish a new concept, from “engineer to order” to e.g. “configure to order”, it must be engaged earlier in the business process and with other than usual customers, which might complicate the process. Research limitations/implications – Experiences from Sweden and Swedish developments are the main source of information. Originality/value – The paper introduces the articles that are a source of scientifically generated knowledge regarding various problems and opportunities associated with supply chain management in the project-based construction industry.

1 January 2017 in Sustainable Cities and Society
Verified
Journal Article
Closed access
BYBin Yang
Bin Yang
Thomas OlofssonThomas Olofsson
Thomas Olofsson
GNGireesh Nair
Gireesh Nair
AKAlan Kabanshi
Alan Kabanshi

1 September 2019 in Building and Environment
Verified
Journal Article
Closed access
BYBin Yang
Bin Yang
XCXiaogang CHENG
Xiaogang CHENG
DDDengxin Dai
Dengxin Dai
Thomas OlofssonThomas Olofsson
Thomas Olofsson
HLHaibo Li
Haibo Li
AMAlan Meier
Alan Meier

1 March 2007 in Automation in Construction
Verified
Journal Article
Closed access
RJRogier Jongeling
Rogier Jongeling
Thomas OlofssonThomas Olofsson
Thomas Olofsson