This research aims to review the current state and limitations of water resources management in Nigeria and explore how adopting an integrated approach to water management can strengthen socio-economic development. As the support for integrated water resources management (IWRM) grows, it is necessary to explore how feasible it is in the Nigerian context especially with many Nigerian states facing water stress even with the country's substantial resources. This paper reviews literature related to the implementation of IWRM around the world with particular reference to developing countries in Africa and draws parallels between their experience and the possibilities that exist for IWRM in Nigeria. Progress on adopting IWRM in Nigeria is discussed and the pitfalls to implementing IWRM in practice are identified. Among the hindrances to effective water resources management in the country is the lack of good water governance, which has affected the quality of water legislation and institutions. This paper concludes that the slow progress of IWRM implementation in Nigeria is the result of an unclear framework for implementing IWRM in the country. This paper recommends an iterative approach to implementing IWRM that allows for adaptation and is tailored to solve specific water problems in Nigeria.
This paper reviews the partnership between the public and the private sectors in providing efficient solid waste management (SWM) services. While the responsibility of providing SWM services lies with the public sector, the sector has not been able to meet the demand for efficient service delivery, especially in developing countries. In a bid to increase efficiency and lower costs incurred in rendering these services, the involvement of the private sector has been sought. With a focus on major Nigerian cities, partnerships between the local government and private operators in SWM have been analysed based on the level to which the partnership has improved the SWM services. This paper provides an understanding that the success of any public-private partnership relies on the extent to which all stakeholders perform their duties. If the public sector is slack in monitoring and supervising the activities of the private operators, the latter may focus on profit generation while neglecting efficient service delivery. Also, legislation is an important part of SWM. Without the right legislation and enforcement, waste generators will not be mandated to dispose their waste properly. The public sector as a facilitator is responsible for creating an environment for private operators to function, particularly through legislation, enforcement and public sensitization.
1 November 2019 in IOP Conference Series: Materials Science and Engineering
This research is aimed at reviewing the current position and implication of sustainable national development of Nigeria as it concerns holistic water resources management. A new model of integrated water resources management (IWRM) has been developed by researchers and theorists and supported by international organisations that emphasize the multifunctional nature of water. However, there has been much debate on the feasibility of IWRM especially in the African context. The approach adopted in this paper is the review of literature centred on the implementation of IWRM in developing countries and with particular reference to Africa and makes recommendations that would ensure continued progress in the management of water resources in Nigeria. Among the conclusions reached in this paper is the fact that although the process of implementing IWRM in Nigeria may be difficult, a progressive approach that prioritises capacity development, policy and institutional reforms, and transparency will go a long way towards ensuring that Nigeria’s vast water resources are managed and developed in a way that maximises benefit while maintaining the health of the natural environment.
25 September 2020 in International Journal of Engineering Research in Africa
The challenge of various methods of analysis of rainfall intensity for design runoff estimation is in the availability of data for the given area. This work aims to evaluate the use of the Intensity Duration and Frequency (IDF) method in design runoff estimation using a rainfall analysis model for low data catchment areas such as Nigeria. The source of the data for the study is the Nigerian Meteorological Agency, and it is for Lokoja, a city in the North Central Zone of the country. Analysis of the data compared to the annual and partial duration series for rainfall intensities at various return periods. Also analyzed was the daily rainfall data to determine the rainfall intensity for the different duration and return periods for the study area. From the analysis, partial duration series analysis offered better design estimates than the annual series. Also noted is the fact that the intensity of rainfall increases with a return period of a given duration. The work also indicates that frequency curves can be used to extrapolate rainfall intensity of a given duration for a longer period than years of record. The paper, therefore, presents a design intensity equation useful for the estimation runoff necessary for sustainable infrastructures such as in water utilization and controls.