Yasar Lafta

Yasar Lafta

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 November 2024 in IEEE Access
Verified
Journal Article
Open access
YHYousif Khalid Hamad
Yousif Khalid Hamad
AHAli Hussain
Ali Hussain
YLYasar Lafta
Yasar Lafta
Ali Al-NajiAli Al-Naji
Ali Al-Naji
JCJavaan Chahl
Javaan Chahl
In recent years, the use of renewable energy sources by many power grid companies worldwide has increased significantly. The trend towards the use of renewable energy sources is mainly due to environmental issues and rising fuel prices associated with conventional electricity generation. Distributed generation units are power generation plants that are very important for the grid architecture of today’s power system. The benefit of adding these Distributed Generation (DG) units is to increase the power supply to the grid. However, the installation of DG units can cause a negative impact if not properly allocated and/or sized. Therefore, there is a need for their optimal sizing and allocation to avoid situations such as voltage instability and high investment cost. In this paper, four heuristic based algorithms, namely Particle Swarm Optimization (PSO) algorithm, Whale Optimization Algorithm (WOA), Dolphin Echolocation Optimization (DEO), and Slime Mould Algorithm (SMA) are applied to solve the optimal placement and sizing of DG units in distribution network planning. Three cases were used to address the network problems, which are represented by adding photovoltaic cells and wind turbines individually. In the last case, both were used, and the feasibility of algorithms was confirmed for two systems, IEEE 33-bus and 69-bus test systems. The comparison results showed that the SMA algorithm produces good solutions. In general, the SMA algorithm was able to reduce the two system losses. The reduction of real power losses in SMA, taking into account the technical and economic constraints in the IEEE 33 system, is reduced to a minimum of 66.31%, 67.3%, and 81.1%, While in 69 bus, reduced to a minimum of 90.7%,91%,and 97.30% for three cases respectively, as well as improving the voltage profile, thus obtaining a more efficient system.

1 February 2020 in International Journal of Electrical and Computer Engineering (IJECE)
Verified
Journal Article
Open access
PDF file
NSNadheer Shalash
Nadheer Shalash
YLYasar Lafta
Yasar Lafta
PSS/E based placement wind/PV hybrid system to improve stability of Iraqi grid

31 May 2018 in International Journal of Control and Automation
Verified
Journal Article
Closed access
YLYasar Lafta
Yasar Lafta
NSNadheer A. Shalash
Nadheer A. Shalash
YAYaser N. Abd
Yaser N. Abd
AAAli A. Al-Lami
Ali A. Al-Lami

1 January 2019 in Cogent Engineering
Verified
Journal Article
Open access
YLYasar Lafta
Yasar Lafta
NSNadheer A. Shalash
Nadheer A. Shalash
YAYaser N. Abd
Yaser N. Abd
ALAli A. Al- Lami
Ali A. Al- Lami
The calculation of short circuit (SC) current has to be accurate because of their importance in power protection system’s design and to determine the capacity of the protective devices. Therefore, there are many standards and programs to estimate SC calculation. The aim of this paper is to provide further calculation methods’ understanding for determining SC current in PSS/E program. Here, the characteristics of SC at the busbars of Al-Nassiriya power plant; with 400/132 KV local transformers; which is part of Iraqi power system is analyzed using PSS/E program methods such as automatic sequence fault calculation (ASCC), IEC 60909 and (ANSI) standards. The finding of results comparison between the three methods refers that IEC standard result was the most accurate one in subtransient current calculation. This paper concludes that IEC have the best method to be followed in subtransient current calculations for Iraq power grid expansion studies and planning.

14 January 2023 in Cogent Engineering
Verified
Journal Article
Open access
NSNadheer Shalash
Nadheer Shalash
YLYasar Lafta
Yasar Lafta
MLMafaza N. Lafta
Mafaza N. Lafta
Evaluating the rated MVA sizes of the Circuit Breaker (CB) requires calculating reactance parameters from fault analysis and synchronizing these parameters with the reference re- striking voltage. In this paper two ways are used in controlling X/R ratio of the system to reduce CB size in order to save cost on system configuration. PSS/E program was introduced to facilitate and illustrate the solution. X/R ratio and subtransient reactance were calculated to provide an approach to assess the current and duty interruption of generator buses with contributions from all other buses. The effect of reduction factors and NACD for the symmetrical component of the short circuit current is also applied in our proposed method. The obtained results proved that applying the reduction factor technique in New England system reduces the rated interruptions of C.Bs, and CB rate is also minimized in Bismayah132kV power plant from Iraqi grid utilizing effective switching which economizes choosing CB. It is concluded that the two techniques can be used successfully for designing CB ratings with a minimum cost.

1 January 2024 in AIP Conference Proceedings
Verified
Conference Paper
Closed access
PDF file
YHYousif Khalid Hamad
Yousif Khalid Hamad
AHAli Hussain
Ali Hussain
YLYasar Lafta
Yasar Lafta
In recent years, the use of renewable energy sources by many power grid companies worldwide has increased significantly. The trend towards the use of renewable In recent years, the use of renewable energy sources by many power grid companies worldwide has increased significantly. The trend towards the use of renewable