Tunneling in highly permeable ground using a slurry shield machine can be challenging because it is difficult to form the so-called filter cake on the tunnel face to transport the support pressure. Consequently, destructive accidents might happen, such as face instability and water inrush. How to form an efficient filter cake in time is crucial during engineering practice, especially in ground with high permeability. Various theoretical and experimental analyses regarding the formation of filter cakes have been conducted. However, due to the complexity of this problem, which has to incorporate the mechanical and hydraulic behaviors of the fluid–solid mixture system, few numerical simulations are found in the literature. In this paper, with the aid of a newly developed numerical tool, a coupled CFD (computational fluid dynamics)–DEM (discrete element method) simulation is established to study the slurry infiltration and filter cake formation during slurry shield tunneling. The slurry infiltration process is simulated by modelling the scheme of the infiltration column test, in which sedimentation behaviors of slurry particles are captured and compared with experimental results. The results show that the sedimentation behaviors of the slurry particles and filter cake formation phenomenon are well captured by simulations and in accordance with the experiments, which indicates the robustness of the coupled CFD–DEM simulation used in present work.
Constructing deeply-buried stormwater sewage and storage tunnels is an effective method to mitigate the waterlogging and sewer overflow problems in modern cities. Prior to construction of such tunnels, a structural loading test is essential for acquiring the mechanical responses under complex loading conditions, such as cyclic inner hydraulic head, during which capturing the full-ring deformation of the tunnel lining is significant for a comprehensive understanding of the tunnel’s mechanical behaviors. This paper introduces the application of terrestrial laser scanning (TLS) technology in the full-scale structural loading tests of a large stormwater sewage and storage tunnel, which gives the full-ring deformation throughout the tests. A data processing methodology was developed to extract the key data points of the lining segments from the original data cloud by removing noise points and mitigating data jump, based on which the deformation of testing the lining segments at arbitrary locations can be calculated. Furthermore, a post-processing software was developed to visualize the full-ring deformation. The full-ring deformation at different loading conditions and its evolution under cyclic loading were captured. It is shown that the lining’s convergence deformation is more sensitive to the inner hydraulic head than to the external soil-water pressure, and the deformation cannot fully recover in a water-inflow-and-drainage cycle due to the presence of joints.
1 October 2020 in IOP Conference Series: Earth and Environmental Science
Slurry infiltration process contributes to the stability of tunnel face significantly during slurry shield tunneling construction. The support pressure cannot be transmitted efficiently to the face unless a compact filter cake forms. This paper aims at investigating the formation of filter cake in saturated sand by slurry infiltration column tests. A series of tests were performed under different filtration pressures using three concentrations of slurry in four types of saturated sand stratums. In order to obtain the characters of the infiltration process and filter cake, pore pressure evolution was measured. Three types of filter cakes were observed in the tests, including external filter cake, external filter cake plus internal filter cake and deep infiltration. External filter cake transmits support pressure efficiently, while the other two types of filter cakes cannot provide sufficiently support pressure for the tunnel face. Especially, deep infiltration behaves no capacity of retaining pressure and should be avoided in engineering practice.