The article presents experimental studies of typical Finnish highly insulated (HI) envelopes with thermal resistance values ( R value) for the wall and roof inside the ventilation cavity between 7.7 and 8.1 m2K/W and 13 m2K/W, respectively. The conditions in the ventilation cavities were studied by using typical and increased R values for the exterior part of the cavity, which were 0.18 m2K/W and 1.57 m2K/W in the walls, and 0.13 m2K/W and 2.13 m2K/W for the roof. With higher exterior R values of 1.57 m2K/W and 2.13 m2K/W, the cavity temperature increased only after closing the inlet gap of the cavities. If the cavity inlet was closed, the restriction of the outlet gap from 20–25 mm to 10 mm had no significant effect on the temperatures. A closed ventilation inlet resulted in increased absolute humidity in the cavity, which indicates that the restriction of cavity ventilation should be made with care to avoid impairing the drying-out ability. The computational analysis showed that the optimal air change rates in the wall and roof cavities of HI structures were 4–40 1/h and 20 1/h, respectively. The conventional 22-mm-thick wood cladding enables safe cavity conditions in HI walls if the vapor barrier is vapor tight and other moisture sources are low. A lower heat flux and additional heat loss caused by cloudless sky at night support the observation that HI roofs have a higher moisture risk. In HI roofs, a conventional exterior R value of 0.13 m2K/W should at least be increased to the range of 0.3–0.4 m2K/W, which is achieved, for example, by a 20-mm-thick mineral wool board under the roofing. The use of mold-resistant materials in the ventilation cavity is recommended to mitigate the possible ramifications of the moisture behavior of HI roofs.
The recent research on highly insulated structures presents controversial conclusions on risks in moisture safety. This paper addresses these controversial issues through investigating the hygrothermal performance of energy efficient envelope structures under high moisture loads. The experiments consist of built-in moisture and rain leakage tests in mineral wool insulated structures. A heat and moisture transfer simulation model is developed to examine the drying-out ability in both warm and cold seasons. The results show that the energy efficient structures have an excellent drying out ability against built-in and leakage moisture. The difference in the drying ability is limited compared to conventional structures. A critical leakage moisture amount reaching the insulation cavity for a wood frame wall is determined to be between 6.9–20.7 g in a single rain event occurring every other day. Further research is required to target highly insulated structures, particularly addressing water vapor diffusion and convection.
This article presents long-term experimental studies on the moisture safety in the ventilation cavities of highly insulated (HI) structures. The tested HI-walls had thermal transmittances of 0.11-0.13 W/m2K. A wall with a thermal transmittance of 0.23 W/m2K represented the baseline wall in the test. In addition to walls, an HI-roof of a newly built house with a U-value of 0.08 W/m2K was measured. The results indicate that, in the ventilation cavity, the relative humidity of an HI-wall exceeds 1-7% of the humidity measured from the baseline wall during winter, which coincides with the 0.4-1.5ºC lower temperatures observed in the HI-walls. The mold risk in the ventilation cavities of the walls is low, as the value of the mold index (MI) remains below one, which indicates small amounts of microscopic mold only on surfaces. However, at the bottom of the cavity, the MI value reaches 1.4 due to lower temperatures. In the HI-roof, the MI values are between 1.0 and 2.0 in the middle of the cavity in winter. The reasons for the higher mold risk of the roof are the humid weather, the built-in moisture of the roof and the low heat flux from inside. The study confirms that, in the future, warmer weather and increased humidity can increase moisture risks in the ventilation cavities. The results support the use of materials that are more resistant to mold in the outer parts of structures.
The study comprises three laboratory tests in which typical Finnish highly insulated (HI) walls were exposed to concentrated leakages of indoor air under steady outdoor temperatures of 1–5°C. Airflows with a relative humidity of 50% and at rates of 1–3 L/min were directed close to the wooden frames inside the walls. The thermal resistance ratios between the exterior sheathing(s) and the whole wall (Γ) were 20%–22% and 1%–10% for the HI and baseline (BL) walls. The HI walls that presented Γ values of at least 20% were observed to be resistant to air exfiltration, and their durability was not affected by the addition of a gypsum sheathing outside the wooden frame or a more permeable vapor retarder. This is related to the negative linear correlation that exists between the moisture accumulation rate in wood-based material and the dew point depression (DPD) value. The developed approach, called the DPD method, shows that a significant degree of moisture accumulation does not occur even for DPD values of as low as −2°C if the exterior sheathing is vapor permeable. The airflow does not penetrate into the rigid mineral wool sheathing, which helps to avoid interstitial condensation. Regardless of thermal transmittance, the HI and BL walls with maximum Γ values of 1% were exposed to a high relative humidity and even interstitial condensation because the DPD values were often below −2°C. For these walls, the mold index analysis and visual observations confirmed the local risk for mold growth on the opposite side of the leakage point. In practice, long-term mold growth may be limited if the seasonal periods during which the outdoor temperature is 1–5°C last for a maximum of about 1 month every year.
The energy efficiency of ice hockey arenas is a central concern for the administrations, as these buildings are well known to consume a large amount of energy. Since they are composite, complex systems, solutions to such a problem can be approached from many different areas, from managerial to technological to more strictly physical. In this paper we consider heat transfer processes in an ice hockey hall, during operating conditions, with a bottom-up approach based upon on-site measurements. Detailed heat flux, relative humidity and temperature data for the ice pad and the indoor air are used for a heat balance calculation in the steady-state regime, which quantifies the impact of each single heat source. We then solve the heat conduction equation for the ice pad in transient regime, and obtain a generic analytical formula for the temperature profile that can be used in practical applications. We then apply this formula to the resurfacing process for validation, and find good agreement with an analogous numerical solution. Since it is given with implicit initial condition and boundary conditions, it can be used not only in ice hockey halls, but in a large variety of engineering applications.