Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
SASungjin Ahn
Sungjin Ahn
TKTaehui Kim
Taehui Kim
YPYoung-Jun Park
Young-Jun Park
JKJi-Myong Kim
Ji-Myong Kim
Construction worker safety and safety training continue to be the main issues in the construction industry. As a means of improving construction worker safety, this study focuses on safety training at an actual construction worksite. In order to promote safety awareness among workers, it is imperative to develop more effective safety training. This study examined safety training as a method of improving construction worker safety, focusing on the effectiveness of the instructional delivery method. Effectiveness pertains to level of understanding of instruction and can be enhanced through improving instructional delivery method. This study aims to examine two different types of safety training methods: (1) the conventional lecture method and (2) innovative method using the 3D Building Information Modeling (BIM) simulation, reflecting the hazard condition of the actual site. An experiment is conducted, in which the two types of training are implemented and assessed through testing trainees’ understanding. The workers trained via BIM simulation showed a higher level of understanding than the group of workers who were trained conventionally. Also, a survey was conducted targeting safety managers, in which the workers evaluated lifelike quality of the training, active learning and enjoyment that each of the training methods can promote. This research will provide implications that an innovative method using the virtual reality is more effective than the conventional lecture method.

6 July 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
JKJi-Myong Kim
Ji-Myong Kim
Kiyoung SonKiyoung Son
Kiyoung Son
SYSang-Guk Yum
Sang-Guk Yum
SASungjin Ahn
Sungjin Ahn
This study analyzed the relative risks of migrant workers, and identified risk factors based on quantitative data for the systematic safety management of migrant workers. Many studies have found that migrant workers are more vulnerable to safety accidents than non-migrant workers. Nevertheless, there are few quantitative studies of migrant workers’ accident-risk in the construction industry, where safety accidents are most frequent. In addition, safety management for the identified accident risk factors has not been implemented systematically. To fill the gap, this study uses safety accident data from construction sites, from the +, for the methodical safety management of migrant workers. The t-test and multiple regression analysis methods are used to define the variance in non-migrant and migrant workers, and the risk indicators, respectively. The two analyses show that the results for migrant construction workers were 2.2% higher in safety accident severity than non-migrant workers, and significant factors are also different. This study’s results will provide critical guidance for the safety management of migrant construction workers.

5 September 2019 in Maxillofacial Plastic and Reconstructive Surgery
Verified
Journal Article
Open access
PDF file
HCHyun-Jae Cho
Hyun-Jae Cho
JJJae-Yun Jeon
Jae-Yun Jeon
SASungjin Ahn
Sungjin Ahn
SLSung Won Lee
Sung Won Lee
JCJoo-Ryun Chung
Joo-Ryun Chung
KHKyung-Gyun Hwang
Kyung-Gyun Hwang
The concept of the ideal morphology for the alveolar bone form is an important element to reconstruct or restore the in maximizing esthetic profile and functional alveolar bone restoration. The purpose of this preliminary study is to evaluate the normal alveolar bone structure to provide the standard reference and guide template for use in diagnosing for implant placement, determining the correct amount of bone augmentation in actual clinical practice and producing prostheses based on three-dimensional imaging assessment of alveolar bone. This study was included 11 men and 11 women (average age, 22.6 and 24.5 years, respectively) selected from among 127 patients. The horizontal widths of alveolar bone of maxilla and mandible were measured at the crestal, mid-root, and root apex level on MDCT (multi-detector computed tomography) images reconstructed by medical imaging software. In addition, tooth dimensions of the central incisors, canines, second premolars, and first molars of maxilla and mandible, including the horizontal width of the interdental alveolar bone crest, were also measured and statistically analyzed. The horizontal alveolar bone width of the palatal side of maxilla showed a distinct increment from the alveolar bone crest to the apical region in both anterior and posterior areas. The average widths of the maxillary alveolar ridge were as follows: central incisor, 7.43 mm; canine, 8.91 mm; second premolar, 9.57 mm; and first molar, 12.38 mm. The average widths of the mandibular alveolar ridge were as follows: central incisor, 6.21 mm; canine, 8.55 mm; second premolar, 8.45 mm; and first molar, 10.02 mm. In the buccal side, the alveolar bone width was not increased from the crest to the apical region. The horizontal alveolar bone width of an apical and mandibular border region was thinner than at the mid-root level. The results of the preliminary study are useful as a clinical guideline when determining dental implant diameter and position. And also, these measurements can also be useful during the production of prefabricated membranes and customized alveolar bone scaffolds.

28 September 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
SYSang-Guk Yum
Sang-Guk Yum
SASungjin Ahn
Sungjin Ahn
JBJunseo Bae
Junseo Bae
JKJi-Myong Kim
Ji-Myong Kim
Tunnel construction, a common byproduct of rapid economic growth and transportation-system development, carries inherent risks to life and various kinds of property that operations and management professionals must take into account. Due to various and complicated geological conditions, tunnel construction projects can produce unexpected collapses, landslides, avalanches, and water-related hazards. Moreover, damage from such events can be intensified by other factors, including geological hazards caused by natural disasters, such as heavy rainfall and earthquakes, resulting in huge social, economic, and environmental losses. Therefore, the present research conducted multiple linear regression analyses on financial-loss data arising from tunnel construction in Korea to develop a novel tunnel-focused method of natural-hazard risk assessment. More specifically, the total insured value and actual value of damage to 277 tunnel-construction projects were utilized to identify significant natural-disaster indicators linked to unexpected construction-budget overruns and construction-scheduling delays. Damage ratios (i.e., actual losses over total insured project value) were used as objective, quantitative indices of the extent of damage that can be usefully applied irrespective of project size. Natural-hazard impact data—specifically wind speed, rainfall, and flood occurrences—were applied as the independent variables in the regression model. In the regression model, maximum wind speed was found to be correlated with tunnel projects’ financial losses across all three of the natural-hazard indicators. The present research results can serve as important baseline references for natural disaster-related risk assessments of tunnel-construction projects, and thus serve the wider purpose of balanced and sustainable development.

23 April 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
SASungjin Ahn
Sungjin Ahn
TKTaehui Kim
Taehui Kim
JKJi-Myong Kim
Ji-Myong Kim
Due to the recent introduction of innovative construction methods and technologies, construction projects increasingly require sustainability in their high degrees of specialization and complex work processes. This is due to a wide variety of new risk factors associated with construction projects that can lead to extensive and severe damage. When an accident occurs during a construction project, it can cause material, property, or bodily damage not only within the actual construction site but also outside, affecting third parties. This study analyzed the record of such third-party damage and the subsequent financial losses in bridge construction management, to identify the objective and quantified relationship of risk indicators related to the damage and losses. In order to assess the actual losses in construction projects, we adopted the loss claim payout data as recorded and provided by a major Korean insurance company, and conducted a multiple regression analysis to identify the loss indicators and to develop a loss estimation model. In this study, the analysis of the data indicated that the superstructure type, the foundation type, floods, and company ranking by the amount of the contract were the four statistically significant risk indicators that affected financial losses from third-party damage, among the nine variables used as independent variables, which included the superstructure type, foundation type, superstructure construction method, maximum span length, floods, typhoons, total construction cost, total construction period, and company ranking. As this study focused on identifying the risk factors and producing a loss assessment model quantified in numerical values, the results provide important references for assessing and minimizing the risks to third parties and the consequential financial losses in bridge construction, while promoting sustainability objectives.

2 November 2019 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
JKJi-Myong Kim
Ji-Myong Kim
TKTaehui Kim
Taehui Kim
JBJunseo Bae
Junseo Bae
Kiyoung SonKiyoung Son
Kiyoung Son
SASungjin Ahn
Sungjin Ahn
There are many risks and uncertainties in plant construction projects, because of their complexity, difficulty in loss prediction and size of construction being large. The risk management of such plant construction projects should not be relied solely on the experiences and intuition of the contractors or the construction managers as it has been in the past. For that reason, a new quantitative and empirical risk analysis is required, in order for the development of a+65 risk assessment using risk indicators for the plant construction projects. This research used the insurance payout record from a global insurance company to reflect the actual quantitative loss in the risk assessment model for plant construction project. The researchers adopted the geographic information as well as construction information, (construction phase and commissioning phase, process rate, total duration) as the independent variables, which found to be statistically significant in the analysis in this study. In the analysis, in which the researchers adopted the geographic information and construction information as the independent variables, it was found that, as the relationship between damage ratio and the valid variables were identified as statistically significant, the damage function model is statistically significant. This research suggests that the regression model containing such valid independent variables could be beneficial in terms of providing foundational guidelines for the plant construction project risk analysis.