Photovoltaic (PV) energy generation in microgrids (MGs) is increasing. Battery energy storage systems (BESSs) reduce the fluctuations in PV outputs caused by the intermittent availability of solar energy. Although BESSs are advantageous for stable MG operation, they are still relatively expensive. By remaining within the operational limits during normal and contingency operation, optimal sizing of BESS is required to maintain security considering cost of MG system. This paper proposes a BESS sizing optimization approach for MGs by solving the security constrained optimal power flow (SCOPF), considering the stochastic errors in forecasting the PV outputs. The degree of compensation for the solar energy forecasting error is firstly configured. To address these errors, the combined PV and BESS operation system is modeled by applying a control strategy to smooth PV fluctuations and minimize battery life degradation. BESS sizing optimization, under a certain degree of compensation, minimizes the PV penalty cost and BESS operation cost. The optimal BESS capacity and schedule are then obtained for the MG. To enhance the convergence and computational efficiency, decomposed-probabilistic security constrained optimal power flow (D-PSCOPF) is proposed. It efficiently solves the problem by dividing it into a master problem and a slave problem. The base case solution is computed in the slave problem, which induces the partial optimal size of BESS. By adding the feasibility cut through the violation of the slave problem, the master problem derives the optimal BESS capacity. Different case studies were analyzed, confirming the superiority and computational efficiency of the proposed approach.
As renewable penetration increases in microgrids (MGs), the use of battery energy storage systems (BESSs) has become indispensable for optimal MG operation. Although BESSs are advantageous for economic and stable MG operation, their life degradation should be considered for maximizing cost savings. This paper proposes an optimal BESS scheduling for MGs to solve the stochastic unit commitment problem, considering the uncertainties in renewables and load. Through the proposed BESS scheduling, the life degradation of BESSs is minimized, and MG operation becomes economically feasible. To address the aforementioned uncertainties, a scenario-based method was applied using Monte Carlo simulation and the K-means clustering algorithm for scenario generation and reduction, respectively. By implementing the rainflow-counting algorithm, the BESS charge/discharge state profile was obtained. To formulate the cycle aging stress function and examine the life cycle cost (LCC) of a BESS more realistically, the nonlinear cycle aging stress function was partially linearized. Benders decomposition was adopted for minimizing the BESS cycle aging, total operating cost, and LCC. To this end, the general problem was divided into a master problem and subproblems to consider uncertainties and optimize the BESS charging/discharging scheduling problem via parallel processing. To demonstrate the effectiveness and benefits of the proposed BESS optimal scheduling in MG operation, different case studies were analyzed. The simulation results confirmed the superiority and improved performance of the proposed scheduling.