Public private partnerships (PPP) and private financial initiative (PFI) projects face the challenge of meeting unforeseen future risks. Life cycle cost estimate is a crucial part of PFI/PPP procurement. The traditional deterministic cost model can not take into consideration the uncertainty of future events let alone determine the contingency allowance for the projects. The large number of cost items in the life cycle cost model of building projects makes cost control difficult. Monte Carlo simulation method is applied to the Quantitative Risk Assessment of life cycle costing risk management. A PFI school project was chosen as a case study to demonstrate a new simulation approach to life cycle cost management. The lives and replacement cost rates of building elements are the inputs for the simulation model, while the cumulative life cycle cost are the outputs of the analysis. The sensitivity analysis revealed the cost significant items, which provides the most efficient way for cost control. The results of the analysis identify the high risk life cycle assumptions and provide a variation reference for the decision-makers to define risk and contingency allowance in PFI/PPP projects. The approach can also be applied to other types of building PFI projects.
1 March 2014 in Journal of Management in Engineering
This paper investigates sustainability in building projects from a whole life project management perspective. The objective of the research is to identify unique features of whole life project management and their relationship to building sustainability by using a case study of a social housing project. The procurement method adopted in the case study is private finance initiative (PFI), which requires private contractors to manage the whole life of a project. The project reached a financial close in 2007, with a contract period of 30 years. Data were collected from multiple sources, including interviews, document reviews, and on-site visits during a three-year period. Based on seven microlevel attributes for building sustainability, data were content-analyzed to discover effective strategies used in whole life project management to achieve the sustainability objectives of the client. The PFI procurement process increased the accountability of the private contractor in sustainability, while the whole life project management approaches smoothed the progress in practicing sustainable construction. The analysis results show that the whole life project management of the different project stages contributes to seven sustainable attributes in a variety of forms.
Due to the complex structure and stakeholder relationships within a program, the management of conflicts in program therein proves more challenging than with a single project. The internal conflict of a program affects the performance of the program team and the success of the program. The previous researches focus more on the project level rather than program level, and lack a systematic analysis of management mechanism of team conflict. This research contributes to the program conflict literature by investigating the unique nature and solutions of conflict within program team, taking a systematic and innovative view on the organizational structure of a complex construction program. The findings reveal unique program conflict and their causes and impacts, and suggest the principles and alternative resolution strategies for conflict in program. The different roles of stakeholders in program conflict are analyzed by social network method. A program conflict management model is developed for the effective management of program conflicts. The model provides a systematic view of the learning cycle of program conflict management, including conflict identification, resolution, feedback, and prevention, of which many patterns are found distinct from project conflict management. The research results can benefit practitioners and researchers in better understanding and minimizing program conflict.
PPP is considered a tool for Sustainable Development Goals (SDGs) by the United Nations, however its instrumentality has never been investigated by previous research. This study explores the instrumental attributes of PPP and their contributions to the SDGs by developing a theoretical model to demonstrate their relationships. A structured analytical framework is developed to re-organise SDGs, based on the WSR method. The instrumental attributes of PPP are identified and classified into six categories. Based on the findings, practical suggestions are provided for the governments to improve the instrumentality of PPP for SDGs. The results can help the governments and practitioners in the global PPP market better understand and improve the instrumentality of PPP in achieving SDGs.
Innovation is an important driving force for realizing high-quality economic development, which puts forward higher requirements for environmental protection enterprises to meet the dual goals of economic development and ecological protection. In order to better evaluate the innovation-driven development performance of environmental protection enterprises, a hybrid method is applied in this paper. Based on the sample data of 20 large-scale environmental protection enterprises investing in public–private partnership (PPP) projects from 2018 to 2020, the innovation-driven development performance is measured. The results show that the innovation-driven efficiency of environmental protection enterprises for infrastructure construction is significantly different, and the improvement of pure technical efficiency of environmental protection enterprises is obviously better than scale efficiency. Furthermore, the reasons influencing the innovation efficiency are analyzed and discussed. The results suggest that more attention should be paid to the transformation of labor and capital in environmental protection enterprises, and the use of innovation-driven resources should be optimized. Future studies can apply the hybrid method to measure the innovation-driven performance of environmental protection enterprises in other countries, so as to verify the effectiveness of the hybrid method proposed in this paper and overcome the limitations of the research conclusions.