Qingwen Ren

Qingwen Ren


Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 February 2009 in Science China Technological Sciences
Verified
Journal Article
Closed access
PDF file
QRQingwen Ren
Qingwen Ren
YDYuWen Dong
YuWen Dong
TYTianTang Yu
TianTang Yu

13 April 2016 in Archive of Applied Mechanics
Verified
Journal Article
Closed access
PDF file
YYYang Yan
Yang Yan
QRQingwen Ren
Qingwen Ren
NXNing Xia
Ning Xia
LZLinfei Zhang
Linfei Zhang

1 October 2007 in Science China Technological Sciences
Verified
Journal Article
Closed access
PDF file
QRQingwen Ren
Qingwen Ren
LXLanYu Xu
LanYu Xu
YWYunHui Wan
YunHui Wan

19 December 2012 in Chinese Science Bulletin
Verified
Journal Article
Open access
PDF file
QRQingwen Ren
Qingwen Ren
QLQiang Li
Qiang Li
SLShuang Liu
Shuang Liu
To develop national economy and use the water resources and hydropower resources sufficiently, a lot of high arch dams, with the height of more than 200 m, have been and will be built in China. Although arch dams have good mechanical behavior, there is still failure possibility due to the huge water pressure and high stress level in dam, complex topographic and geologic conditions, formidable environment and high intensity earthquake. As one of the three main aspects concerning the safety of high arch dam, the study on global destruction, has been elaborated in the literatures, and research advance in the other two aspects, namely the failure risk and local damage of high arch dams, will be reviewed in this paper. In recent years, the failure risk of high arch dams has been investigated, and the model for identifying dam failure risk factors has been established. It is shown that the foundation deterioration and strong earthquake are the major risk sources for high dam failure. With the fault tree method, the failure mode and failure probability of high arch dams are studied, and the principle for determining failure mode and the method of calculating failure probability are proposed. Meanwhile, the determination principle of acceptable risk standard for high arch dam was proposed, and the acceptable risk rate and the acceptable standard value of various risk losses were given. For the local damage of arch dam, it is pointed out that the local damage belongs to the strength failure at material level. The study on local failure mechanism of arch dam is reviewed, based on the theories that from traditional strength theory to damage mechanics and meso-mechanics theory. Aiming at the cracking, the main pattern of local failure of high concrete dam, the research advances in the analysis methods and cracking criteria for smeared crack model and discrete crack model are summarized, and the research findings of preventive measures for local failure are shown.

6 June 2022 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
XYXiang Yang
Xiang Yang
XRXuhua Ren
Xuhua Ren
QRQingwen Ren
Qingwen Ren

30 January 2016 in Science China Technological Sciences
Verified
Journal Article
Closed access
PDF file
YYYin Yang
Yin Yang
QRQingwen Ren
Qingwen Ren
YTYing Tian
Ying Tian
YXYao Xiong
Yao Xiong