Conventional preventive maintenance (PM) strategies under two-dimensional (2D) warranties are usually age-based or usage-based, which means that the implementation of PM activities is based solely on item age or usage. In this paper, a new PM strategy, called 2D PM strategy, is proposed for items sold with a 2D warranty. Under this strategy, the item is preventively maintained every K units of age or L units of usage, whichever occurs first. The marginal approach is used to describe the effect of age and usage on item reliability by treating usage as a random function of age. Besides, the effect of PM is characterised by the reduction of virtual age. The objective of this study is to identify the optimal 2D PM strategy under fixed warranty terms so as to minimise the total expected warranty servicing cost from the manufacturer’s perspective. A numerical example is provided to demonstrate the effectiveness of the proposed PM strategy. It is shown that the 2D PM strategy contains the age-based and usage-based strategies as special cases, and outperforms them in terms of warranty servicing cost. Finally, how to implement the proposed PM strategy in practice is discussed with an illustrative case.
3 May 2023 in International Journal of Production Research
A joint maintenance decision-making framework is proposed to optimise the long-term maintenance plan and lower the maintenance cost for offshore wind farms. The historical wind speed data are screened by using the method of k-means clustering, and Markov chains are established for the wind speed in different seasons. On this basis, the approach of Markov chain Monte Carlo is applied to simulate the distribution of repair vessel's waiting time for maintenance, where the impact of wind speed on maintenance availability is considered. Moreover, the components in wind turbines are divided into four states according to their effective ages, i.e. young, mature, old and failed, respectively. A maintenance decision model is established, with the objective to minimise maintenance cost. Besides, three types of opportunistic maintenance are considered, i.e. failure-based opportunistic maintenance (FBOM), event-based opportunistic maintenance (EBOM) and age-based opportunistic maintenance (ABOM), respectively. The enhanced elitist genetic algorithm (SEGA) is adopted to solve the optimisation problem. The results indicate that among the three types of opportunistic maintenance, ABOM can reduce maintenance cost more effectively, and it is more suitable for long-term maintenance plans of offshore wind farm.
1 March 2016 in Quality and Reliability Engineering International
Maintenance optimisation is a multi-objective problem in nature, and it usually needs to achieve a trade-off among the conflicting objectives. In this study, a multi-objective maintenance optimisation (MOMO) model is proposed for electromechanical products, where both the soft failure and hard failure are considered, and minimal repair is performed accordingly. Imperfect preventive maintenance (IPM) is carried out during the preplanned periods, and modelled with a hybrid failure rate model and quasi-renewal coefficient. The initial IPM period and the total number of IPM periods are set as the decision variables, and a MOMO model is developed to optimise the availability and cost rate concurrently. The fast elitist non-dominated sorting genetic algorithm (NSGA-II) is applied to solve the model. A case study of wind turbine’s gearbox is provided. The results show that there are 30 optimal solutions in the MOMO’s Pareto frontier that can maximise the availability and minimise the cost rate simultaneously. Compared with the single-objective maintenance optimisation, it can provide more choices for maintenance decision, and better satisfy the resource constraints and the customer’s preference. The results of the sensitivity analysis show that the effect of age reduction factor on optimisation results is greater than that of failure rate increase factor.