Peter Amoako-Yirenkyi

Peter Amoako-Yirenkyi

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 September 2016 in Advances in Difference Equations
Verified
Journal Article
Open access
PDF file
PAPeter Amoako-Yirenkyi
Peter Amoako-Yirenkyi
JAJustice Kwame Appati
Justice Kwame Appati
IDIsaac Kwame Dontwi
Isaac Kwame Dontwi
We present a new way of constructing a fractional-based convolution mask with an application to image edge analysis. The mask was constructed based on the Riemann-Liouville fractional derivative which is a special form of the Srivastava-Owa operator. This operator is generally known to be robust in solving a range of differential equations due to its inherent property of memory effect. However, its application in constructing a convolution mask can be devastating if not carefully constructed. In this paper, we show another effective way of constructing a fractional-based convolution mask that is able to find edges in detail quite significantly. The resulting mask can trap both local discontinuities in intensity and its derivatives as well as locating Dirac edges. The experiments conducted on the mask were done using some selected well known synthetic and Medical images with realistic geometry. Using visual perception and performing both mean square error and peak signal-to-noise ratios analysis, the method demonstrated significant advantages over other known methods.

9 August 2023 in Heliyon
Verified
Journal Article
Open access
FOFrank Kofi Owusu
Frank Kofi Owusu
PAPeter Amoako-Yirenkyi
Peter Amoako-Yirenkyi
NFNana Kena Frempong
Nana Kena Frempong
AOAkoto Yaw Omari-Sasu
Akoto Yaw Omari-Sasu
IMIsaac Adjei Mensah
Isaac Adjei Mensah
ASAdu Sakyi
Adu Sakyi
In this extant paper, a multivariate time series model using the seemingly unrelated times series equation (SUTSE) framework is proposed to forecast the peak and short-term electricity demand using time series data from February 2, 2014, to August 2, 2018. Further the Markov Chain Monte Carlo (MCMC) method, Gibbs Sampler, together with the Kalman Filter were applied to the SUTSE model to simulate the variances to predict the next day's peak and electricity demand. Relying on the study results, the running ergodic mean showed the convergence of the MCMC process. Before forecasting the peak and short-term electricity demand, a week's prediction from the 28th to the 2nd of August of 2018 was analyzed and it found that there is a possible decrease in the daily energy over time. Further, the forecast for the next day (August 3, 2018) was about 2187 MW and 44090 MWh for the peak and electricity demands respectively. Finally, the robustness of the SUTSE model was assessed in comparison to the SUTSE model without MCMC. Evidently, SUTSE with the MCMC method had recorded an accuracy of about 96% and 95.8% for Peak demand and daily energy respectively.

27 March 2023 in International Journal of Photoenergy
Verified
Journal Article
Open access
PDF file
AAAli Abubakar
Ali Abubakar
RBReindorf Nartey Borkor
Reindorf Nartey Borkor
PAPeter Amoako-Yirenkyi
Peter Amoako-Yirenkyi
Generally, the main focus of the grid-linked photovoltaic systems is to scale up the photovoltaic penetration level to ensure full electricity consumption coverage. However, due to the stochasticity and nondispatchable nature of its generation, significant adverse impacts such as power overloading, voltage, harmonics, current, and frequency instabilities on the utility grid arise. These impacts vary in severity as a function of the degree of penetration level of the photovoltaic system. Thus, the design problem involves optimizing the two conflicting objectives in the presence of uncertainty without violating the grid’s operational limitations. Nevertheless, existing studies avoid the technical impact and scalarize the conflicting stochastic objectives into a single stochastic objective to lessen the degree of complexity of the problem. This study proposes a stochastic multiobjective methodology to decide on the optimum allowable photovoltaic penetration level for an electricity grid system at an optimum cost without violating the system’s operational constraints. Five cutting-edge multiobjective optimization algorithms were implemented and compared using hypervolume metric, execution time, and nonparametric statistical analysis to obtain a quality solution. The results indicated that a Hybrid NSGAII-MOPSO had better convergence, diversity, and execution time capacity to handle the complex problem. The analysis of the obtained optimal solution shows that a practical design methodology could accurately decide the maximum allowable photovoltaic penetration level to match up the energy demand of any grid-linked system at a minimum cost without collapsing the grid’s operational limitations even under fluctuating weather conditions. Comparatively, the stochastic approach enables the development of a more sustainable and affordable grid-connected system.

7 July 2022 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
AAAli Abubakar
Ali Abubakar
RBReindorf Nartey Borkor
Reindorf Nartey Borkor
PAPeter Amoako-Yirenkyi
Peter Amoako-Yirenkyi
In terms of energy production, combining conventional and renewable energy sources prove to be more sustainable and cost-effective. Nevertheless, efficient planning and designing of such systems are extremely complex due to the intermittency of renewable sources. Many existing studies fail to capture the stochasticity and/or avoid detailed reliability analysis. This research proposes a practical stochastic multi-objective optimization tool for optimally laying out and sizing the components of a grid-linked system to optimize system power at a low cost. A comparative analysis of four state-of-the-art algorithms using the hypervolume measure, execution time, and nonparametric statistical analysis revealed that the nondominated sorting genetic algorithm III (NSGA-III) was more promising, despite its significantly longer execution time. According to the NSGA-III calculations, given solar irradiance and energy profiles, the household would need to install a 5.5 (kWh) solar panel tilted at 26.3° and orientated at 0.52° to produce 65.6 (kWh) of power. The best battery size needed to store enough excess power to improve reliability was 2.3 (kWh). The cost for the design was $73520. In comparison, the stochastic technique allows for the construction of a grid-linked system that is far more cost-effective and reliable.

17 April 2017 in International Journal of Computer Applications
Verified
Journal Article
Closed access
MWMatilda Wilson
Matilda Wilson
AYAnthony Y.
Anthony Y.
CHCharles H.
Charles H.
PAPeter Amoako-Yirenkyi
Peter Amoako-Yirenkyi