Bo Zhang

Bo Zhang


Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2020 in Construction and Building Materials
Verified
Journal Article
Closed access
YZYijie Zhang
Yijie Zhang
SWShugang Wang
Shugang Wang
BZBo Zhang
Bo Zhang
DHDongshuai Hou
Dongshuai Hou
HLHaiyan Li
Haiyan Li
CLChunjin Lin
Chunjin Lin

15 January 2019 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
XWXintong Wang
Xintong Wang
SLShucai Li
Shucai Li
ZXZhenhao Xu
Zhenhao Xu
YXYiguo Xue
Yiguo Xue
JHJie Hu
Jie Hu
BZBo Zhang
Bo Zhang

1 February 2018 in International Journal of Geomechanics
Verified
Journal Article
Closed access
ZXZ. H. Xu
Z. H. Xu
JWJing Wu
Jing Wu
SLS. C. Li
S. C. Li
BZBo Zhang
Bo Zhang
XHXin Huang
Xin Huang
A semianalytical solution to determine the minimum safety thickness of the rock resisting water inrush from filling-type karst caves was investigated. Mechanical analyses of the filling materials in karst caves located in a top, bottom, and lateral position to the tunnel were carried out by referring to the principle of the slice method. The mechanical mechanism of rock resisting water inrush was analyzed by adopting the theory of elastic mechanics. The semiquantitative analytical method for calculating the minimum safety thickness of the rock for resisting water inrush was achieved according to the bending strength and shear strength of the rock. The safety-thickness-prediction models of rock for resisting water inrush were applied in practical projects of the Luzhuba tunnel. The accuracy and availability of the proposed method were proven by comparing with the rock stratum thickness–span ratio method. The minimum safety thickness affected by the depth-span ratio of the filling-type karst cave, shear strength indexes of the filling materials, and the depth of the tunnel was analyzed and discussed. The results show that the minimum safety thickness of the rock resisting water inrush (1) decreases 0.02 m for every 2-m increase in cave height and increases 0.01 m for every 2-m increase in cave span such that the influence of the karst cave height is greater than the karst cave span on the minimum safety thickness; (2) decreases gradually with an increase of effective soil cohesion and decreases 0.03 m for every 5° increase in effective internal friction angle of the soil; and (3) increases 0.18 m for every 1-m increase in tunnel depth.

23 May 2017 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
SLS. C. Li
S. C. Li
JWJing Wu
Jing Wu
ZXZhenhao Xu
Zhenhao Xu
LZL. Zhou
L. Zhou
BZBo Zhang
Bo Zhang

4 November 2020 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
CWC. Wei
C. Wei
BZBo Zhang
Bo Zhang
WZW. Zhu
W. Zhu
SWShugang Wang
Shugang Wang
JLJ. Li
J. Li
CLC. Lin
C. Lin

9 February 2022 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
BLBiao Li
Biao Li
MHMengmeng Hu
Mengmeng Hu
BZBo Zhang
Bo Zhang
NLNingbo Li
Ningbo Li
WSWei Shao
Wei Shao
BXBin Xu
Bin Xu