Hyung Tae Kim

Mr. Hyung Tae Kim


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 April 2019 in Energies
Verified
Journal Article
Open access
PDF file
HKHyung Tae Kim
Hyung Tae Kim
Young Gyu JinYoung Gyu Jin
Young Gyu Jin
YYYong Yoon
Yong Yoon
The capacity of battery energy storage systems (BESS) is expected to increase for power system applications. However, as the cost of BESS is high, economic feasibility must be considered when using BESS in grid applications. Load leveling with BESS is one such application for which the economic implications have been analyzed in the literature. However, these studies do not sufficiently consider the fact that the leveled loads will lead to a change in electricity prices, thereby modifying charging/discharging operations of BESS. Additionally, in a competitive electricity market, electricity prices are not determined by the generator cost functions. Market participants’ strategic decisions also affect prices. Therefore, we conducted an economic analysis of load leveling with BESS in an electricity market from the perspective of a utility company and/or a government agency. In our analysis of the Korean market, we examine whether the leveled loads necessarily lead to economic benefits. Load leveling performance and the associated economic benefit are quantitatively analyzed for varying sizes of BESS. Further, the policy implications related to using BESS are derived from the analysis results.