Mohammad Hassan Nazari

Dr. Mohammad Hassan Nazari


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2019 in Energy
Verified
Journal Article
Closed access
ALAlireza Lorestani
Alireza Lorestani
Gevork B. GharehpetianGevork B. Gharehpetian
Gevork B. Gharehpetian
MNMohammad Hassan Nazari
Mohammad Hassan Nazari

18 May 2020 in IEEE Access
Verified
Journal Article
Open access
MBMehrdad Bagheri-Sanjareh
Mehrdad Bagheri-Sanjareh
MNMohammad Hassan Nazari
Mohammad Hassan Nazari
Gevork B. GharehpetianGevork B. Gharehpetian
Gevork B. Gharehpetian
This paper proposes a novel and optimal battery sizing procedure for the primary frequency control (PFC) of islanded microgrid (MG). The Battery Energy Storage System (BESS), Photovoltaic (PV) systems and LED Lighting Loads (LEDLLs) are coordinated to quickly intercept frequency deviation in the stage of PFC. The PVs decrease their power generation in the case of surplus of power generation. The LEDLLs decrease their power consumption in the case of power shortage. The BESS participates in PFC in both cases by injecting/absorbing power. Some batteries with overloading characteristics are capable of fast discharge/charge for a short period, which can be used to reduce the required battery size for PFC application. The conventional overloading characteristics is based on constant power discharge/charge, but the BESS power varies in response to frequency deviation. To overcome this problem, a modified overloading characteristic is presented based on variable power discharge/charge, which is used to propose a battery sizing algorithm. The Genetic Algorithm is used to optimally determine the frequency controllers’ coefficients of the BESS, PVs and LEDLLs to minimize the required battery size while maintaining the MG frequency within safe operational limits. The proposed battery sizing procedure is evaluated on the CIGRE low voltage benchmark system using simulation in MATLAB/Simulink software. The results show that beside the overloading characteristics of the battery, the participation of PVs and LEDLLs in PFC also reduces the required battery size, because their participation reduces the share of BESS participation in PFC.

3 January 2024 in IEEE Transactions on Sustainable Energy
Verified
Journal Article
Closed access
MAMohammad Amini
Mohammad Amini
MSMehrdad Bagheri Sanjareh
Mehrdad Bagheri Sanjareh
MNMohammad Hassan Nazari
Mohammad Hassan Nazari
Gevork B. GharehpetianGevork B. Gharehpetian
Gevork B. Gharehpetian
SHS.H Hosseinian
S.H Hosseinian
As the optimal size of the battery energy storage system (BESS) affects microgrid operation economically and technically, this paper focuses on a novel BESS sizing model. This model is based on the battery degradation process (BDP) and it can consider temperature impact on the BESS performance. The proposed model aims to accurately minimize microgrid costs. To this end, the major factors affecting the BDP such as temperature, depth of discharge, incomplete/complete cycles, state of charge, and time passage are linearly incorporated into the proposed model to estimate the amount of the BESS capacity loss. To calculate the BESS cycle aging because of the incomplete/complete cycles, a novel linear framework is introduced. Moreover, the relation between the temperature and the allowable BESS capacity is also modeled and integrated into the BESS sizing model to increase the accuracy of the BESS modeling and achieved results. Various case studies are carried out to show the applicability and effectiveness of the presented model. The conducted simulations demonstrate that the BDP and the temperature impact dramatically affect the BESS performance and the microgrid operation cost. The results also indicate that the proposed model can improve the accuracy of the obtained results by 4.72%.

20 December 2022 in IET Renewable Power Generation
Verified
Journal Article
Open access
MAMohammad Amini
Mohammad Amini
MNMohammad Hassan Nazari
Mohammad Hassan Nazari
SHSeyed Hossein Hosseinian
Seyed Hossein Hosseinian
This study proposes a novel predictive energy management strategy to integrate the battery energy storage (BES) degradation cost into the BES scheduling problem and address the uncertainty in the energy management problem. As the first step, the factors affecting the BES calendar aging and cycle aging are linearly modelled. Furthermore, a linear algorithm is provided to calculate the BES cycle aging due to the BES complete and incomplete cycles. Subsequently, a novel approach to estimating the BES degradation cost function according to the BES specifications and degradation process is presented. Finally, taking into account the BES degradation cost model, the proposed predictive energy management strategy framework is implemented on an integrated photovoltaic and BES system to evaluate the applicability and efficiency of the proposed scheme in integrating the BES degradation cost in the energy management problem. The numerical simulation results indicate that integrating the BES degradation cost into the energy management problem significantly affects the BES charge/discharge strategy. Moreover, comparing the proposed predictive energy management strategy with a simple one, it is verified that the provided approach could decrease the BES capacity fade and degradation cost by 5.06% and 4.67%, respectively, and increase the photovoltaic farm profit by 1.10%.

9 November 2020 in International Journal of Energy Research
Verified
Journal Article
Closed access
PDF file
MBMehrdad Bagheri‐Sanjareh
Mehrdad Bagheri‐Sanjareh
MNMohammad Hassan Nazari
Mohammad Hassan Nazari
SHSeyed Hossein Hosseinian
Seyed Hossein Hosseinian
Summary: The installation of an energy storage system (ESS) is vital for the Micrgorid (MG) islanded operation to ensure the maintenance of demand–supply balance. Lithium‐ion batteries (LIBs) are among the most commonly used ESS technologies for grid‐based applications, which is used in this paper to constantly maintain the demand–supply balance in a residential MG. For this purpose, a novel frequency‐based energy management scheme is proposed. It uses an LIB ESS to handle the primary frequency control and energy management during peak‐load period, while the dispatchable distributed generators like microturbine and fuel cell supply the base load. The air‐conditioning TCLs consume a significant part of the residential load profile, especially during mid‐summer. Unlike TCLs that instantaneously use their generated cooling thermal energy to control indoor temperatures, the thermal energy storage systems (TESSs) can also store the thermal energy and use it later. In this paper, the TESSs are used instead of TCLs to reduce the power consumption of a residential Microgrid (MG) in islanded mode. By doing this, the required LIBESSs capacity is decreased 70% considerably than the case the TCLs are used for controlling the indoor temperatures. Also, replacing the ACs and EHPs with TESSs results in a 63.7% reduction in the total cost of electrical and thermal storage.

22 August 2019 in IEEE Access
Verified
Journal Article
Open access
MNMohammad Hassan Nazari
Mohammad Hassan Nazari
MNMohammad Hassan Nazari
Mohammad Hassan Nazari
EAEhsan Azad-Farsani
Ehsan Azad-Farsani
This study presents a multi-objective policy for harmonic distortion and loss mitigation in micro-grid and active distribution grid. The implementation of this policy in networks including Distributed Generation (DG), is put forward based on the determination of the locational marginal price of each DG bus, considering their impacts on the loss and harmonic mitigation. In this process, each DG receives an incentive in the form of price increment, based on the Aumann-Shapley value game-theoretic method as an iterative algorithm, considering the effectiveness of reducing loss or harmonic distortion. Furthermore, as a decision-making tool, the operator can change the contribution of the incentives used to mitigate the loss or harmonic distortion and make an appropriate estimation for the next step conditions. The simulations are organized based on real data on the modified Taiwan Power Company grid (TPC). The modified TPC consists of renewable energy sources (RES) and fossil-fuel based DG units. Also, to achieve a realistic framework, generation of RES, loads, and market prices are considered as uncertain parameters. The results demonstrate the competence of the proposed method for the TPC network in terms of triple pricing methods comparison, total loss reduction, harmonic mitigation, and merchandising surplus controlling.