A decadal-scale study to retrieve the spatio-temporal precipitation patterns of the Yangtze River basin, China, using the Tropical Rain Mapping Mission, Precipitation Radar (TRMM/PR) data is presented. The empirical orthogonal function (EOF) based on monthly TRMM/PR data extracts several leading precipitation patterns, which are largely connected with physical implications at the basin scale. With the aid of gauge station data, the amplitudes of major principal components (PCs) were used to examine the generic relationships between precipitation variations and hydrological extremes (e.g. floods and droughts) during summer seasons over the past decade. The emergence of such major precipitation patterns clearly reveals the possible linkages with hydrological processes, and the oscillations in relation to the amplitude of major PCs are consistent with these observed hydrological extremes. Although the floods in some sections of the Yangtze River were, to some extent, tied to human activities, such as the removal of wetlands, the variations in major precipitation patterns are recognized as the primary driving force of the flow extremes associated with floods and droughts. The research findings indicate that long-distance hydro-meteorological signals of large-scale precipitation variations over such a large river basin can be successfully identified with the aid of EOF analysis. The retrieved precipitation patterns and their low-frequency jumps of amplitude in relation to PCs are valuable tools to help understand the association between the precipitation variations and the occurrence of hydrological extremes. Such a study can certainly aid in disaster mitigation and decision-making in water resource management. Editor Z.W. Kundzewicz; Associate editor A. Montanari Citation Sun, Z., Chang, N.-B., Huang, Q., and Opp, C., 2013. Precipitation patterns and associated hydrological extremes in the Yangtze River basin, China, using TRMM/PR data and EOF analysis. Hydrological Sciences Journal, 57 (7), 1315–1324.
The retention lake often plays an important role in flood mitigation through the water storage and the lake–river interactions. However, the evolution of real-time flood regulation capacity remains poorly characterized. Using wavelet decomposition and flood peak removing ratios, this study presents a comprehensive evaluation of the characterization, mechanism, and impacts of the flood regulation capacity in Dongting Lake. The results indicate that the change of flood regulation effect of the lake can be well reflected by the multi-year changes in the variances of the inflow and outflow runoffs. The wavelet decomposition indicates that the flood regulation of the lake is mainly functioned on the high-frequency floods with durations less than 32 days. The average yearly flood peak removing ratios range from 0.13 to 0.56, but no significant tendency changes on the effect of the flood regulation capacity has happened during the study period. The changes in maximum regulation volume reveal that the flood regulation of the Dongting Lake is mainly a passive process decided by the complex river–lake relationship and the interactions among different processes of discharge and sediment. The impacts from the large volume reduction caused by sedimentation in the lake is compensated by the increased flood controlling water level, which in turn have resulted in the new phenomenon of “normal discharge, high water level and disaster” in the lake regions after the 1990s. The significant impacts on the lake–river relationship caused by the sediment reallocation from the operation of the Three Gorges Reservoir (TGR) have further changed the hydrological regimes between the lake and the Yangtze River. Influenced by the new lake-river interaction pattern the discharge passing capacity downstream the outlet of the lake is becoming a key factor that affects the flood regulation capacity, which is leading to a shift of the flood pressures from the lake region to the downstream of Yangtze in the near future.
20 May 2020 in Stochastic Environmental Research and Risk Assessment