This paper presents a novel approach to planning distributed generation (DG) and distribution network frames based on a multiscenario technique. In view of the uncertainties of the load and intermittence of the DG output, the annual timing characteristics are analyzed, and the daily load and output of DG are divided into several typical situations according to respective influence factors. In the target planning year, the uncertain units are simulated using the typical daily forecast values, then the probability models are established considering the forecast errors; finally, multiple scenarios are achieved through Latin hypercube sampling and sample reduction. In view of the interaction of DG and distribution network frames, a bilevel coordinated planning model is proposed, in which the upper level planning is aimed to achieve the integrated optimal decision and the goal of the lower level planning is to comprehensively consider the benefits of DG. Finally, hybrid chaos binary particle swarm optimization based on Pareto set theory and niche sharing is applied to make a nested solving of the model, and the superiority and effectiveness of the proposed model are verified in the IEEE 33-node and 69-node distribution systems as the test cases.
13 June 2019 in IEEE Transactions on Industry Applications
With the deepening of electricity market reform in China, the competition in the electricity retail market becomes increasingly intense. Electricity retailers (ERs) need to explore new business models to enhance their competitiveness in the retail market. Meanwhile, with the improvement of industrial production and people's living standards, more and more nonlinear electrical equipment have been put into use, leading to severe harmonic pollution problems. Harmonic pollution causes loss of electricity, resulting in the economic loss of customers, especially for large industrial customers. In the above contexts, this paper proposes a novel business model that incorporates harmonic control as a value-added service into electricity retail contracts for utility-owned ERs. Both utility-owned ERs and customers can benefit from the designed business model. For customers, it helps them to improve the power quality while saving the electricity cost. For ERs, it helps them to cultivate the customer loyalty and improve the customer satisfaction. A case study is performed to demonstrate the effectiveness of the proposed business model.
With the deepening of the reform of the power system, electricity sales companies are required to explore new business models and provide multi-faceted marketing programs for users. At the same time, with the reduction of energy storage (ES) costs and the gradual maturity of technology, user side ES, especially Battery ES, has become an effective means for enhancing users’ power supply reliability and reducing electricity bills. Battery ES, as the standby power supply, has a vast user side application. The configuration of ES can help users to ameliorate power quality and reduce electricity cost. It is a critical strategy for electricity sales companies to improve their competitiveness as well. Firstly, this paper analyzes the user side ES and introduces the user side ES development status and relevant policies. Then, we establish an ES configuration optimization model based on the cost–benefit system. To determine the optimal ES capacity of the system’s storage capacity, non-dominated sorting genetic algorithm with elite strategy (NSGA-II) is used as the method solving model. Finally, according to the cost-effectiveness of ES and the period of a contract signed by users, a price package with ES configuration is designed for users to choose.
With the large number of distributed generation (DG) access to the distribution network, the traditional distribution network with a single-supply radial structure has been transformed into an active distribution system (ADS) with source and bidirectional currents. This transformation makes the calculation of the power supply capacity (PSC) of the ADS face new challenges, and the uncertainty of the DG output increases the difficulty in calculating the PSC. At the same time, the power market transaction check needs to meet the safety constraints of the distribution network operation, and is required to know the PSC information of the ADS more quickly and accurately. Therefore, in order to quickly evaluate the PSC of the ADS, this paper proposes a fast evaluation method of the PSC based on the DG output rolling prediction and the information gap decision theory (IGDT). The method first establishes a rolling prediction model of the DG output, and calculates the PSC of the ADS at the corresponding time. Next, it establishes a risk avoidance model (RAM) and a risk speculation model (RSM) for the PSC of the ADS based on the IGDT. These models further calculate the probability of the range of the PSC at the corresponding time, so as to better evaluate the PSC of the ADS. Finally, the improved IEEE-14 node is used to verify that the model can consider the influence of the DG output uncertainty and quickly calculate the information of PSC.
Under the background of the rapid development of new energy technology, the concept of virtual power plant (VPP), which is composed of multiple types of DER, is proposed and a power system multi-objective optimization dispatching model of SCUC problem comprehensively considering total power generation costs, pollution treatment costs, unit start-up and stop costs is established and the node power transfer factor is introduced to deal with the static security constraints under DC load flow. The improved particle swarm optimization (IMPSO), a combination of PSO and Binary PSO (BPSO), is employed, and Matlab platform is used to solve the above model. At last, a case is adopted to prove the validity and feasibility of model and algorithm, which confirms that the research of VPP participating in dispatching is of far-reaching significance.
This paper proposes a real-time evaluation method for power supply capacity of distribution network with distributed generation (DG) based on the uncertainty of DG output and the cyclical change characteristics of power grid load. The method considers the situation that various types of DG in distribution network generate electricity complementally and obtains the future load and DG output through prediction technology. The optimization model is established using the maximum load that can be supplied by distribution network as objective function and the safe operation requirements of the system as constraint conditions. The model can give change curves of power supply capacity and power supply margin of distribution network for a period of time in the future, which allows dispatchers to take corresponding measures in advance according to the evaluation results to ensure the safety and reliability of power grid operation. Considering the situation that load growth in the same proportion may result in large errors, the relative growth rate is used here to construct load growth mode. Finally, a practical example is employed to verify the feasibility and effectiveness of the proposed method and model.