TINGJIN LIU

TINGJIN LIU


Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 January 2020 in European Journal of Environmental and Civil Engineering
Verified
Journal Article
Closed access
TLTINGJIN LIU
TINGJIN LIU
SCSi-Wei Chen
Si-Wei Chen
PLPei-Qin Lin
Pei-Qin Lin
Hongyuan LiuHongyuan Liu
Hongyuan Liu
This study investigates the failure mechanism and strengthening effect of a shield tunnel lining structure reinforced via steel plates with corbels. A detailed three-dimensional (3D) numerical model is established for the staggered-joint segmental lining structure of an actual shield tunnel in the Kunming metro-system, which is then validated via a full-scale simulation experiment of the shield tunnel segmental lining structure. Then, the actual loading conditions of the staggered-joint shield tunnel segmental lining structure in the Kunming metro-system are simulated, and the mechanical responses of the segmental lining are analysed in terms of the variation in its diameter, opening amount of the joints and stress of the bolts. The ultimate load-bearing capacity of the lining structure reinforced using steel plates with corbels is improved to 610 kN, which is 41.9% higher than the unreinforced structure with an ultimate load-bearing capacity of 430 kN. Moreover, the strengthening effect of the reinforcement using steel plates with corbels is discussed considering actual field monitoring data and other reinforcement methods. It is concluded that the results of this paper can provide an effective reference for similar reinforcement schemes of shield tunnels. The defined classification criteria can be adopted to determine the deformation stage of reinforced shield tunnels.

1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
TLTINGJIN LIU
TINGJIN LIU
HHHonghao Huang
Honghao Huang
YYYUBING YANG
YUBING YANG
Early detection of crack is critical for the maintenance of reinforced concrete (RC) structures. In this study, a distributed optical fiber (DOF) sensing system with Rayleigh Optical Frequency Domain Reflectometry (OFDR) technique was deployed to a member of RC structure in a full‐scale laboratory experiment, which was subjected to a monotonic lateral load. With the aid of a high space resolution (up to 1 mm) and measurement accuracy (±1 micro strain) interrogator (OSI‐S by Semicon), continuous strain measurements inside of the RC member are elaborately implemented. The result of crack detection by the analysis of the measured tensile strain profiles is in excellent agreement with the visually observable cracks mapped during the test. This confirms the ability of the optical fiber inside of RC members to capture cracks on concrete surface. Moreover, the recognition of crack orientation and depth is accomplished by comparing strain measurements of optical fibers installed at multiple locations.

26 September 2019 in Marine Georesources & Geotechnology
Verified
Journal Article
Closed access
TLTINGJIN LIU
TINGJIN LIU
HHHonghao Huang
Honghao Huang
ZYZhenrui Yan
Zhenrui Yan
XTXinwei Tang
Xinwei Tang
Hongyuan LiuHongyuan Liu
Hongyuan Liu
The Zhanjiang Bay Sea-crossing Tunnel is the first phase of an ambitious plan of the Golden Triangle Economic Zone in southwestern China and passes underneath the deepest artificial shipping channel with the highest level in Asia. The tunnel is a world-record extralong and small-diameter corridor constructed using an uninterrupted single-end shield tunneling method in subsea soft ground under ultrahigh hydraulic pressure for water conveyance. This case study first highlights the engineering challenges of constructing the sea-crossing shield tunnel in subsea soft ground under ultrahigh hydraulic pressure. A series of key techniques are then investigated and some innovations are proposed to address the engineering challenges in the following four key aspects of the sea-crossing shield tunneling process: (a) optimal design of segmental linings; (b) adaptive reformation of the shield machine; (c) structural construction of deep vertical shafts; and (d) supporting techniques of long-distance advancing. On the basis of the field monitoring and numerical analyses, it is concluded that the implemented key techniques ensure the successful management and control of the engineering challenges in terms of optimizing the segmental lining, selecting the shield machine and constructing the vertical working shaft during the sea-crossing shield tunneling process with limited geological investigation data available under submarine conditions.

12 January 2021 in International Journal of Concrete Structures and Materials
Verified
Journal Article
Open access
PDF file
TLTINGJIN LIU
TINGJIN LIU
JLJiandong Lu
Jiandong Lu
DWDi Wang
Di Wang
Hongyuan LiuHongyuan Liu
Hongyuan Liu
Prefabricated construction is becoming increasingly prevalent, however, it is rarely applied in underground constructions, except for tunnel linings, due to the difficulties that arise in jointing various prefabricated components in underground conditions. To solve the vertical location problem of embedded mechanical couplers during the construction of wall–beam–strut joints for a prefabricated metro station, a new connection using welded steel plates is proposed. In this paper, four full-scale specimens of wall–beam–strut joints connected using welded steel plates and mechanical couplers were experimentally tested under monotonic and low-reversed cyclic loading conditions. The testing results were analysed in terms of the ultimate bearing capacity, failure mode, hysteresis, skeleton curve, stiffness degradation, energy dissipation and strain of the reinforcement bars. Notably, the two kinds of joints had similar ultimate bearing capacities and failure modes, but the crack distributions on the tops of the waler beams were different. For the specimens with the welded steel plate connection, tensile horizontal cracks first appeared on the top surface of the beam, where the welded steel plate was located, and then coalesced gradually; however, this cracking pattern was not observed during the experimental test of the specimens connected with the mechanical couplers. Furthermore, it was determined that the energy dissipation and ductility of the welded steel plate connection were better than those of the mechanical coupler connected joint, because the steel plate could redistribute the internal force in the joint and increase the stiffness. It was concluded that the proposed welded steel plate connection could be more favourable than the mechanical coupler connection in the construction of a prefabricated metro station in Guangzhou. Moreover, the results obtained from these experiments could provide guidelines for the corresponding connections employed in underground-prefabricated structures.

7 August 2020 in International Journal of Concrete Structures and Materials
Verified
Journal Article
Open access
PDF file
TLTINGJIN LIU
TINGJIN LIU
JLJiandong Lu
Jiandong Lu
Hongyuan LiuHongyuan Liu
Hongyuan Liu
This paper investigates the nonlinear behavior of wall-beam-strut joints with mechanical couplers, which are proposed for prefabricated underground constructions, under monotonic and cyclic loading conditions using full-scale experimental tests and three-dimensional finite element modelings. The nonlinear behavior of the joint is discussed in terms of the load–displacement curves, concrete cracking distributions, and strains in the reinforcements obtained from both the experimental tests and the numerical modeling. The comparison indicates that the trends of both load–displacement curves are similar, although the cracking, yield and ultimate loads of the joints determined by the numerical modeling are 2.5% lower, 2.6% higher and 3.8% higher, respectively, than those determined by the experimental tests. The numerical simulation can capture the concrete cracking process in the joint in the early loading stage but cannot accurately model the crack distribution in later stages. Moreover, the reinforcement strains and the skeleton curve from the numerical modeling show the same tendency as those from the experimental test, but it is difficult to compare their exact values, especially after yielding. The differences are believed due to the fact that the numerical modeling idealizes the materials and fails to model the slippage between the reinforcements and concrete after the concrete cracking. On the basis of the experimental and numerical investigations, it is concluded that the proposed wall-beam-strut joint has not only an ultimate bearing capacity that is at least 3 times higher than the design load but also a good ductility. Therefore, the design of the wall-beam-strut joint satisfies the requirements for the prefabricated underground construction.

27 October 2022 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
TLTINGJIN LIU
TINGJIN LIU
SZShuyi Zhang
Shuyi Zhang
KYKepeng Yu
Kepeng Yu
Hongyuan LiuHongyuan Liu
Hongyuan Liu
The combined mining and shield tunneling method solves the challenge that shield machine is slow to excavate hard rock formations during tunneling in complex mixed grounds such as soft soils mixed with hard rocks, which, however, causes the deformation and cracking of tunnel segments. Both in-situ field measurements and three-dimensional numerical simulations are conducted in this study to analyze the segment deformation and cracking mechanism of a tunnel excavated in complex mix grounds with the combined mining and shield tunneling method. It is concluded that the segment deformation and cracking are caused by insufficient pea-gravel fillings and uneven grouting pressures. To ensure the tunnel ovality satisfying standards and minimize the segment deformation and cracking, the angle range of the tunnel wrapped in the pea gravel should be greater than 180° and the resistance coefficient provided by the filling layer after grouting should be greater than 20 MPa/m. Moreover, it is found that the difference between the grouting pressures at the top and bottom of the tunnel has a significant impact on the overall deformation and opening amount of the joints between the segments.