Cloud manufacturing is characterized by large uncertainties and disturbances due to its networked, distributed, and loosely coupled features. To target the problem of frequent cloud resource node failure, this paper proposes (1) three resource substitution strategies based on node redundancy and (2) a new robustness analysis method for cloud manufacturing systems based on a combination of the complex network and multi-agent simulation. First, a multi-agent simulation model is constructed, and simulation evaluation indexes are designed to study the robustness of the dynamic cloud manufacturing process (CMP). Second, a complex network model of cloud manufacturing resources is established to analyze the static topological robustness of the cloud manufacturing network. Four types of node failure modes are defined, based on the initial and recomputed topologies. Further, three resource substitution strategies are proposed (i.e., internal replacement, external replacement, and internal–external integration replacement) to enable the normal operation of the system after resource node failure. Third, a case study is conducted for a cloud manufacturing project of a new energy vehicle. The results show that (1) the proposed robustness of service index is effective at describing the variations in CMP robustness, (2) the two node failure modes based on the recalculated topology are more destructive to the robustness of the CMP than the two based on the initial topology, and (3) under all four failure modes, all three resource substitution strategies can improve the robustness of the dynamic CMP to some extent, with the internal–external integration replacement strategy being most effective, followed by the external replacement strategy, and then the internal replacement strategy.
In the multi-variety and small-quantity manufacturing environment, changeover operation occurs frequently, and cooperative changeover method is often used as a way to shorten the changeover time and balance the workload. However, more workers and tasks will be affected by cooperative changeover. As such, the effectiveness of the cooperative changeover is dependent on other factors, such as the scope of cooperation and the proportion of newly introduced products. For this reason, this paper proposes a hybrid modeling method to support the simulation study of the production team's cooperative changeover strategies under various environments. Firstly, a hybrid simulation modeling method consisting of multi-agent systems and discrete events is introduced. Secondly, according to the scope of cooperation, this paper puts forward four kinds of cooperative changeover strategies. This paper also describes the cooperative line-changing behavior of operators. Finally, based on the changeover strategies, the proposed simulation method is applied to a production cell. Four production scenarios are considered according to the proportion of newly introduced part. The performance of various cooperative strategies in different production scenarios is simulated, and the statistical test results show that the optimal or satisfactory strategy can be determined in each production scenario. Additionally, the effectiveness and practicability of the proposed modeling method are verified.