Cheng Zhu

Dr. Cheng Zhu


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 March 2020 in Energy Science & Engineering
Verified
Journal Article
Open access
PDF file
CZCheng Zhu
Cheng Zhu
Yong YuanYong Yuan
Yong Yuan
CYChaofeng Yuan
Chaofeng Yuan
FLFu‐Quan Liu
Fu‐Quan Liu
ZCZhongshun Chen
Zhongshun Chen
SWSheng‐Zhi Wang
Sheng‐Zhi Wang
Many mines often passively select supports with a higher yield load to avoid the occurrence of support crushing and roof falling during periodic weighting. This method is not conducive to improving production efficiency or reducing mining costs, but it can ensure safe mining. An effective method for overcoming these problems is to determine the reasonable working resistance of the support according to the structural forms of the key strata in the overburden of the stope during periodic weighting. In this paper, comprehensive theoretical analysis, numerical simulation, and field observation were applied to study the discrimination of the key stratum structure (KSS) during periodic weighting and the calculation method of the support load. First, the KSS that affects the periodic weighting of the stope was classified. The “twice discrimination method” was proposed for determining the breaking form of the key strata and the articulated form of the broken blocks. On this basis, the spacing condition that determines whether adjacent key strata interact was analyzed. The discriminant conditions for synergistic breaking between the first subordinate key stratum (SKS1) and the upper key stratum were derived for the cases in which the SKS1 periodically breaks in the form of a cantilever beam, a voussoir beam, and a step beam. These conditions provide the basis for distinguishing the KSS in the overburden of the stope. In addition, mechanical models of the roof structure during periodic weighting were established, and general formulas for calculating the support loads of stopes with a single‐key‐stratum influence structure and a multikey‐stratum influence structure were presented. Finally, five fully mechanized coal faces with various mining conditions in China were considered for engineering verification. The results of this study demonstrate that the proposed method for determining the reasonable working resistance of the support is consistent with the field practice. The research results can provide a reference for roof control and support selection of stopes.

1 July 2019 in Energy Science & Engineering
Verified
Journal Article
Open access
PDF file
Yong YuanYong Yuan
Yong Yuan
LZLIU ZHI-HENG
LIU ZHI-HENG
CZCheng Zhu
Cheng Zhu
CYChaofeng Yuan
Chaofeng Yuan
SWSheng‐Zhi Wang
Sheng‐Zhi Wang
Burnt rock is a geo‐material widely existed in many countries. After the rock mass is burned, the fracture is developed, the structure is destroyed, the integrity and strength are reduced, and a good water storage space is formed in suitable hydration conditions. In this paper, the roof fall characteristics and failure mechanism of inclined shaft in shallow water‐rich burnt rock area (SWRBRA) are analyzed using theoretical analysis, numerical simulation, and field measurement. It is revealed that the main factors causing the instability of surrounding rock on inclined shaft in SWRBRA are the deterioration of structure and integrity after rock mass is burnt, the weakening of surrounding rock strength under the action of fissure water, and the lagging support method. Therefore, the key measure to control the stability of surrounding rock in SWRBRA is to block cracks to eliminate the weakening effect of water and advance reinforcement to improve the surrounding rock strength. Through the comprehensive technologies such as rear roadway reinforcement, filling, and rebuilding artificial false roof and pipe shed advanced support, the effective restoration of the roof fall area in SWRBRA is realized. The surrounding rock fractures were closed, the strength of surrounding rock is improved by means of grouting reinforcement, and the stability control of surrounding rock of inclined shaft in SWRBRA is achieved.

1 January 2019 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
CZCheng Zhu
Cheng Zhu
Yong YuanYong Yuan
Yong Yuan
ZCZhongshun Chen
Zhongshun Chen
ZLZhiheng Liu
Zhiheng Liu
CYChaofeng Yuan
Chaofeng Yuan
The stability control of the rock surrounding recovery roadways guarantees the safety of the extraction of equipment. Roof falling and support crushing are prone to occur in double‐key strata (DKS) faces in shallow seams during the extraction of equipment. Therefore, this paper focuses on the stability control of the rock surrounding DKS recovery roadways by combining field observations, theoretical analysis, and numerical simulations. First, pressure relief technology, which can effectively release the accumulated rock pressure in the roof, is introduced according to the periodic weighting characteristics of DKS roofs. A reasonable application scope and the applicable conditions for pressure relief technology are given. Considering the influence of the eroded area on the roof structure, two roof mechanics models of DKS are established. The calculation results show that the yield load of the support in the eroded area is low. A scheme for strengthening the support with individual hydraulic props is proposed, and then, the support design of the recovery roadway is improved based on the time effects of fracture development. The width of the recovery roadway and supporting parameters is redesigned according to engineering experience. Finally, constitutive models of the support and compacted rock mass in the gob are developed with FLAC3D software to simulate the failure characteristics of the surrounding rock during pressure relief and equipment extraction. The surrounding rock control effects of two support designs and three extraction schemes are comprehensively evaluated. The results show that the surrounding rock control effect of Scheme 1, which combines improved support design and the bidirectional extraction of equipment, is the best. Engineering application results show that Scheme 1 realizes the safe extraction of equipment. The research results can provide a reference and experience for use in the stability control of rock surrounding recovery roadways in shallow seams.

27 June 2013 in Applied Mechanics and Materials
Verified
Journal Article
Closed access
PDF file
CZCheng Zhu
Cheng Zhu
The TAF epoxy asphalt concrete (EAC) is a new steel bridge deck pavement materials , the application of the TAF EAC is increasing in China. But the research for some of it's performance and construction technology is not throughly, which results in the useful life of the bridge deck paving materials greatly reducing. This paper focuses on the design and construction methods of the Japanese TAF epoxy asphalt concrete, and take the Humen bridge steel bridge deck pavement repair project in December 2011 for example.

17 April 2023 in Processes
Verified
Journal Article
Open access
PDF file
WWWenmiao WANG
Wenmiao WANG
Yong YuanYong Yuan
Yong Yuan
Ke DingKe Ding
Ke Ding
ZCZhongshun Chen
Zhongshun Chen
CZCheng Zhu
Cheng Zhu
LLLibao Li
Libao Li
This work focused on the insufficient or excessive pressure relief in large-diameter pressure relief by drilling. The influence of large-diameter pressure relief by drilling on the 6307 working face of the Tangkou coal mine on the roadway deformation was taken as the research background, with numerical simulations, indoor experiments, and on-site applications used. The influence of pressure relief drilling on roadway deformation was studied to propose segmented reaming pressure relief. The influences of parameters (e.g., reaming diameter, reaming depth, and borehole spacings) on the evolution characteristics of segmented reaming cracks and pressure relief were further investigated. The results showed that segmented reaming pressure relief reduced the roadway deformation and the peak elastic energy of coal in the impacted hazard area and improved the energy accumulation of the surrounding rocks of the roadway. The effect of segmented reaming pressure relief was positively correlated with the diameter and length of the reaming section; it was negatively correlated with borehole spacings. The optimized segmented reaming parameters of the 6307 working surface of Tangkou coal mine are as follows: the optimized reaming diameter of 240 mm, the reaming section depth of 15 m, and the borehole spacing of 1.6 m. Field tests proved that the optimized segmented reaming technology can improve the deformation of the surrounding rocks of the roadway and construction.

25 September 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Chen WangChen Wang
Chen Wang
CZCheng Zhu
Cheng Zhu
Yong YuanYong Yuan
Yong Yuan
ZCZhongshun Chen
Zhongshun Chen
WWWenmiao WANG
Wenmiao WANG
The phenomenon of dynamic pressure in the panel under shallowly buried gobs is obvious, resulting in limited and challenging support type selection. In this paper, theoretical analysis, numerical simulation and field measurement were combined to study the reasonable working resistance of the support in panels under shallowly buried gobs. First, the definition of the equivalent main key stratum (EMKS) was proposed. Then, a method of identifying the structure of the EMKS and broken key stratum blocks was given. The roof structure of the panel under a shallowly buried gob (PSBG) during strong periodic weighting could be divided into 12 types. Mechanical models of the roof structure were established, and the method to calculate the working resistance of the support was given. The Bulianta coal mine and Fengjiata coal mine in the Yushenfu Mining Area were taken as research objects. Based on the measured working resistance curve of the support, the structural morphology of key stratum blocks during strong periodic weighting was distinguished. On this basis, the working resistance of the support was calculated. Finally, FLAC2D numerical software was used to test the working resistance of the support. Based on the subsidence of the roof, horizontal displacement of the coal wall and the development range of the plastic zone in the surrounding rock, the working resistance of the support and adaptability of the surrounding rock control were verified and evaluated. The results show that it is reasonable to calculate the working resistance of the support based on the roof structure during strong periodic weighting. The research results can provide a reference for the scientific and rational selection of the support in a PSBG.