It can be predicted that the infrastructure of the existing wireless networks will not fill the requirement of the fifth generation (5G) wireless network due to the high data rates and a large number of expected traffic. Thus, a novel deployment method is crucial to satisfy 5G features. Meta-heuristic is expected to be a promising method for the complex deployment optimization problem of the 5G network. This work presents an implementation of a meta-heuristic algorithm based on swarm intelligence, to minimize the number of base stations (BSs) and optimize their placements in millimeter wave (mmWave) frequencies (e.g., 28 GHz and 38 GHz) in the context of the 5G network while satisfying user data rates requirement. Then, an iterative method is applied to remove redundant BSs. We formulate an optimization problem that takes into account multiple 5G network deployment scenarios. Further, a comparative study is conducted with the well-known simulated annealing (SA) using Monte Carlo simulations to assess the performance of the developed model. In our simulation results, we divide the region of interest into two subareas with different user distributions for different network scenarios while considering the intercell interference. The results demonstrate that the proposed approach has better network coverage with low percentage users in outage. In addition, the developed approach has less computational times to reach the desired target network quality of service (QoS).
With the ever-increasing traffic demand of wireless users, resulting from the huge deployment of Internet-of-Things (IoT) devices and the emergence of smart city applications requiring ultra-low latency networks, the Fifth Generation (5G) of cellular networks have been introduced as a revolutionary broadband technology to boost the quality of service of mobile users. In this paper, we investigate the planning process for a 5G radio access network having mmWave Micro Remote Radio Units (mRRUs) on top of sub-6 GHz Macro Remote Radio Units (MRRUs). We rely on proper channel models and link budgets as well as Urban Macro-cells (UMa) and Urban Micro-cells (UMi) characteristics to carefully formulate a 5G network planning optimization problem. We aim to jointly determine the minimum number of MRRUs and mRRUs to install and find their locations in a given geographical area while fulfilling coverage and user traffic demand constraints. In order to solve this planning process, we propose a two-step process where we first employ a low complexity meta-heuristic algorithm to optimize the locations of RRUs followed by an iterative elimination method to remove redundant cells. To evaluate the performances of this proposed approach, we conduct a comparative study using Accelerated Particle Swarm Optimization and Simulated Annealing. Simulations results using sub-6 GHz UMa and 28 GHz UMi demonstrate the ability of the proposed planning approach to achieve more than 98% coverage with minimum cell capacity outage rate, not exceeding the 2%, for different scenarios and illustrate the efficiency of the evolutionary algorithms in solving this NP-hard problem in reasonable running time.