The objective of this work is to address active deorbit of small-sized space debris in the near-Earth orbit by a space-based pulse laser. A dynamic deorbit model based on perigee altitude was established during space-based laser pulse irradiating the debris. The effects of orbital eccentricity, perigee altitude, true anomaly, and action distance of the debris with the number of pulse lasers and laser powers were obtained. Furthermore, the whole deceleration process of the debris removal irradiated by a pulse laser was intuitively described, and the evolution rules of the debris movement in the whole stage of active deorbit were also demonstrated. As a result, the three-dimensional visualization scene of the debris movement and the complete period evolution images of the debris deorbit were displayed. Finally, the results of numerical computations were consistent with the outcomes of visual simulations based on the given conditions. That is, when the laser power was 500 kW and the number of pulses was 965, the purpose of debris deorbit was completed by four laser irradiations, and the semimajor axis and eccentricity of the debris reached were 9915.4 km and 0.338 at the moment. These results can provide an important reference for the integrated research on space-based pulse laser active removal and clearance evaluation of small-sized space debris.
To understand what actually happens in the pavement as aircraft wheels pass by, pavement deflections and strains were plotted against time using field test data collected at Denver International Airport. Shapes of the response–versus–time curves were analyzed in detail, and the locations of the maximum responses are shown graphically.According to the analysis, maximum deflections occur between the dual wheels, whereas maximum strains occur beneath one of the wheels. The plots also show clear reversals in the longitudinal strain–versus–time curves. These strain reversals were carefully investigated and some interesting results were obtained. A method to compute the deflection–based load transfer efficiencies was developed. The computation further showed that the load transfer efficiency for dummy joints is direction dependent, and that the load transfer efficiency decreases significantly during the first year the pavement is in service.