Jianlin Jiang

Jianlin Jiang


Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2019 in Information
Verified
Journal Article
Open access
PDF file
Rongyue ZhengRongyue Zheng
Rongyue Zheng
JJJianlin Jiang
Jianlin Jiang
XHXiaohan Hao
Xiaohan Hao
WRWei Ren
Wei Ren
FXFeng Xiong
Feng Xiong
TZTianqing Zhu
Tianqing Zhu
A building information model (BIM) is of upmost importance with a full life-time cycle in architecture engineering and construction industry. Smart construction relies on BIM to manipulate information flow, data flow, and management flow. Currently, BIM has been explored mainly for information construction and utilization, but there exist few works concerning information security, e.g., audits of critical models and exposure of sensitive models. Moreover, few BIM systems have been proposed to make use of new computing paradigms, such as mobile cloud computing, blockchain and Internet of Things. In this paper, we propose a Context-aware Access Control (CaAC) model for BIM systems on mobile cloud architectures. BIM data can be confidentially accessed according to contexts in a fine-grained manner. We describe functions of CaAC formally by illustrating location-aware access control and time-aware access control. CaAC model can outperform role-based access control for preventing BIM data leakage by distinguishing contexts. In addition, grouping algorithms are also presented for flexibility, in which basic model (user grouping based on user role permissions) and advanced model (user grouping based on user requests) are differentiated. Compared with the traditional role-based access control model, security and feasibility of CaAC are remarkably improved by distinguishing an identical role with multiple contexts. The average efficiency is improved by 2 n / ( 2 n − p − q ) , and time complexity is O ( n ) .

4 September 2019 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JJJianlin Jiang
Jianlin Jiang
JCJianguo Chen
Jianguo Chen
Rongyue ZhengRongyue Zheng
Rongyue Zheng
YZYan Zhou
Yan Zhou
The implementation process of construction projects is an iterative process of continuous modification and improvement among participant organizations. Traditional workflow analysis methods for a single organization are not suitable for the analysis of such implementation processes. Therefore, an interorganizational workflow analysis method based on organizational roles and associated with their collaborative relationships is required. In this study, a role-based interorganizational workflow model for participant organizations is developed, in which it is assumed that interoperability has a loosely coupled form for temporary multi-organizations. The Fuzzy Analytic Hierarchy Process (FAHP) is applied to determine the parameters of the correlation between interorganizational workflows, which includes downstream sensitivity and the probability of change. Furthermore, according to workflow interactions between organizations, an analysis model of interorganizational workflow is developed by using the Design Iteration Model for reference to analyze the time performance of participant organizations. Additionally, two forms of interorganizational workflow are compared and analyzed. Some suggestions are put forward to improve interorganizational workflow management and reduce the total time taken to complete the workflow processing of each organization (T) and the total time spent on the interorganizational workflow process (effort, E). This research may help strengthen interorganizational workflow management and enrich the workflow modeling theory.

3 November 2014
Verified
Conference Paper
Closed access
JJJianlin Jiang
Jianlin Jiang
JCJianguo Chen
Jianguo Chen
During the last few decades, construction projects have shown a trend towards becoming large complicated operations, involving multi-disciplinary and many types of technology. Due to large-scale socialization production and specialization collaboration, there are many participant organizations in the project. Project organizations differ from enterprise organizations. They are one-time, temporary organizations for specific tasks. In a complex and changeful environment, various project participants work together with different responsibilities, objectives and management methods. The project should be precisely organized to ensure an orderly implementation of the project according to the plan. In this paper, collaboration and interactive relationships between various participant organizations of the construction project would be comprehensively and systematically analyzed with the Design Structure Matrix (DSM) method. According to the results of the modeling analysis, appropriate coordination and cooperation mechanism of the contract would be established to ensure a smooth implementation of the project.