As a sustainable construction method, prefabrication has become popular in many nations. However, there are many challenges for prefabrication, especially in terms of cost. Previous studies have revealed that higher capital cost was the most important barrier to the implementation of prefabrication. Thus, the objective of this study is to explore and evaluate the critical factors affecting the capital cost of prefabrication and examine how cost management may be affected by the “experience”, “corporate responsibility”, and “participant function” as a fix independent factors. To achieve the research objective, semi-structured interviews were conducted with 11 experts for the development of the questionnaire. Then, a questionnaire survey was conducted to investigate the significance of 49 factors related to prefabrication capital cost. The survey results revealed that “Specification and standards for prefabricated building design”, “Related experience of manager”, and “Rationality of precast component split” were the most critical factors. In addition, “experience”, “corporate responsibility”, and “participant function” had significant impact on the evaluation of capital cost factors. The findings can facilitate developing a benchmark framework for exploring the factors affecting the capital cost of prefabrication in China.
Prefabrication is considered as a modern method of construction, transferring part of on-site work into factories and generating a new decoupling point in supply chain. Management of prefabricated component (PC) suppliers plays a key role in the performance of prefabricated construction project (PCP). Evaluating and improving supplier management maturity (SMM) become critical issues for large contractors. Previous research on PCP supply chain mainly focused on technology, process and performance aspects, while paying little attention to supplier relationship management. This study proposes an assessment criteria system of supplier management from five dimensions, including procurement process, operation efficiency, relationship coordination and strategy alignment and corporate social responsibility. A maturity grid with five levels is designed to present continuous improvement of supplier management. 34 large PCP construction firms listed in contractor directory were investigated in China through semi-structured interview and questionnaire survey. Independent two-samples t-test and one-way analysis of variance were adopted to explore SMM of different groups according to business scope, procurement method and construction experience. The results indicate that the overall maturity level of supplier management is relatively low, implying that supply activity cannot achieve inter-organization integration. Management on relationship coordination and strategy alignment lag behind procurement management and operation efficiency. Single business contractors have higher SMM than diversified ones. Contractors integrated in engineering, procurement and construction are superior to design-bid-build contractors in supplier management, especially in relationship coordination and strategic alignment. Construction experience is conductive to supplier operation efficiency. Noticeably, there are no statistically significant differences in the performance of corporate social responsibility among different groups. These results will contribute to developing a benchmark framework for contractors to evaluate SMM and achieve continuous improvements in PCP.
Green building is deemed an effective means to realize the sustainable development of environment, economy and society in the construction industry. Green building technologies (GBTS) are important to realize green buildings. In order to make the application of GBTS be adopted and popularized effectively, it is especially important for us to gain thorough comprehension of the key problems that affect the adoption of GBTS. The target of this paper is to better understand the adoption of GBTS from the perspective of designers. This article utilizes a questionnaire to investigate Chinese architectural designers. Through establishing a structural equation model and an analysis of the survey data, the key factors influencing the adoption of GBTS by designers in the Design Company were found out. The results denote that the adoption motivation, the capability of GBTS, the knowledge structure and the defects of GBTS are the significant factors that affect designers’ adoption behaviors. However, the management support of GBTS has no significant effect on designers’ adoption behavior. The research results are helpful to improve adoption of GBTS in design units and accelerate the transformation of GBTS achievements. Additionally, they can promote the application of GBTS in the field of construction. Based on the quantitative theoretical model (the structural equation model), this paper finds out the key factors that affect the application of GBTS from the perspective of designers, enriching the theoretical methods of GBTS research and complementing the relevant literature of GBTS research. Future research will analyze the adoption behavior of GBTS from the point of other stakeholders and from the internal level of the design units.
High capital cost is a significant hindrance to the promotion of prefabrication. In order to optimize cost management and reduce capital cost, this study aims to explore the latent factors and factor analysis evaluation model. Semi-structured interviews were conducted to explore potential variables and then questionnaire survey was employed to collect professionals’ views on their effects. After data collection, exploratory factor analysis was adopted to explore the latent factors. Seven latent factors were identified, including “Management Index”, “Construction Dissipation Index”, “Productivity Index”, “Design Efficiency Index”, “Transport Dissipation Index”, “Material increment Index” and “Depreciation amortization Index”. With these latent factors, a factor analysis evaluation model (FAEM), divided into factor analysis model (FAM) and comprehensive evaluation model (CEM), was established. The FAM was used to explore the effect of observed variables on the high capital cost of prefabrication, while the CEM was used to evaluate comprehensive cost management level on prefabrication projects. Case studies were conducted to verify the models. The results revealed that collaborative management had a positive effect on capital cost of prefabrication. Material increment costs and labor costs had significant impacts on production cost. This study demonstrated the potential of on-site management and standardization design to reduce capital cost. Hence, collaborative management is necessary for cost management of prefabrication. Innovation and detailed design were needed to improve cost performance. The new form of precast component factories can be explored to reduce transportation cost. Meanwhile, targeted strategies can be adopted for different prefabrication projects. The findings optimized the capital cost and improved the cost performance through providing an evaluation and optimization model, which helps managers to evaluate cost management level of prefabrication and explore key inducers for high capital cost.
Case-based reasoning (CBR) has been extensively employed in various construction management areas, involving construction cost prediction, duration estimation, risk management, tendering, bidding and procurement. However, there has been a dearth of research integrating CBR with construction safety management for preventing safety accidents. This paper proposes a CBR model which focuses on case retrieval and reuse to provide safety solutions for new problems. It begins with the identification of case problem attribute and solution attribute, the state of hazard is used to describe the problem attribute based on principles of people’s unsafe behavior and objective’s unsafe state. Frame-based knowledge representation method is adopted to establish the case database from dimensions of slot, facet and facet’s value. Besides, cloud graph method is introduced to determine the attribute weight through analyzing the numerical characteristics of expectation value, entropy value and hyper entropy value. Next, thesaurus method is employed to calculate the similarity between cases including word level similarity and sentence level similarity. Principles and procedures have been provided on case revise and case retain. Finally, a real-world case is conducted to illustrate the applicability and effectiveness of the proposed model. Considering the high potential for pre-control and decision-making of construction safety accident, the proposed model is expected to contribute safety managers to take decisions on prevention measures more efficiently.
Urbanization has brought notable benefits for cities, but has also resulted in severe and diverse challenges in China. Previous studies have contributed to the definitions and evaluation of urbanization. However, there remain a great deal of ambiguities regarding urban comprehensive carrying capacity, and its measurable indicators still need further exploration given the urban development. This study aims to explore a model for evaluating urban comprehensive carrying capacity and thus to promote urban development. A total of 48 indicators which fell into 8 subsystems were identified to evaluate the urban comprehensive carrying capacity through literature reviews and interviews. The indicator set was developed for evaluation indicator selecting. Meanwhile, the dynamic system was explored, and an evaluation model based on the entire array polygon method was designed to evaluate urban comprehensive carrying capacity. Finally, a case study was conducted to provide suggestions for the decision-maker to implement the evaluation model. The results of this study show that the evaluation indicator system was dynamic due to urban development. Meanwhile, the model of the entire array polygon method was able to effectively evaluate urban comprehensive carrying capacity through the case study. Furthermore, this study found that there is an imbalance among subsystems in urban development according to the standard deviation. The findings are useful for setting up a benchmark framework for urban sustainability and providing an evaluation and monitoring model for decision maker to improve the urban carrying capacity.