Rachele Grosso

Rachele Grosso

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 June 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
RGRachele Grosso
Rachele Grosso
Umberto MeccaUmberto Mecca
Umberto Mecca
GMGiuseppe Moglia
Giuseppe Moglia
FPFrancesco Prizzon
Francesco Prizzon
MRManuela Rebaudengo
Manuela Rebaudengo
The Italian way of thinking about maintenance is too often one-sided. Indeed, it is considered not so much as a useful practice to prevent the occurrence of a fault (ex ante), but as an intervention to solve it (ex post). Analyzing the legislation relating to the construction sector, it can be seen that it does not clearly define the responsibilities, timescales and methods in which maintenance interventions must be planned and carried out. For this reason, this practice is still very weak compared, for example, to the industrial sector, where it is an established practice. Currently, the complexity of reading the maintenance plans drawn up by designers and the considerable costs associated with maintenance operations discourage owners and managers from even carrying out preliminary inspection operations. This research aims to stimulate these stakeholders to carry out inspection operations regularly, highlighting their costs and benefits. In particular, working on a case study in Piedmont, the costs of visual inspections carried out in the traditional way are compared with those that would be incurred if unmanned aerial vehicles (UAVs) were used. Finally, the collateral benefits of inspections carried out with UAVs are highlighted.