Anqi SHI

Dr. Anqi SHI


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 December 2020 in Buildings
Verified
Journal Article
Open access
PDF file
Samad SepasgozarSamad Sepasgozar
Samad Sepasgozar
ASAnqi SHI
Anqi SHI
LYLiming Yang
Liming Yang
Sara ShirowzhanSara Shirowzhan
Sara Shirowzhan
David John EdwardsDavid John Edwards
David John Edwards
Additive manufacturing, including 3D printing (3DP), is one of the critical pillars of Industry 4.0 and the next construction revolution. Several countries, including China, have utilized 3DP on larger scales or real projects. However, reviews of the lessons learned from previous large-sized practices of 3DP utilization are scarce. This paper presents a few practical applications of implementing 3DP over the past decade and suggests a direction for future research work. Recent publications on 3DP practices are systematically reviewed using an interpretivist philosophical lens, and more specifically, the nozzle characteristics are focused upon. The Scopus and China National Knowledge Infrastructure (CNKI) journal databases are utilized, resulting in the examination of 54 English and 62 Chinese papers. The selected practices from Mainland China, Hong Kong, Taiwan and Macao are considered for this review. A content critical review approach is adopted, and the identified papers are critically reviewed. These papers reported key challenges and advantages from their reported practices, such as limitations in aggregate sizes, nozzle sizes, standards, post-occupancy satisfaction, final product quality, productivity challenges and other associated risks. The paper reports upon prominent limitations and signposts directions for future investigations.

13 May 2020
Verified
Book Chapter
Open access
PDF file
ASAnqi SHI
Anqi SHI
Sara ShirowzhanSara Shirowzhan
Sara Shirowzhan
Samad SepasgozarSamad Sepasgozar
Samad Sepasgozar
AKAlireza Kaboli
Alireza Kaboli
Digital construction is increasingly introduced to the architecture, engineering, and construction (AEC) industry. The fifth dimension of Building Information Modeling (5D BIM) has a significant contribution to the AEC industry, such as managing time and costs and resources management. However, 5D BIM has not fulfilled its promise completely. The major challenge of implementing the 5D BIM technology and applications is the interoperability between technologies and the low accuracy of measurement estimations. Dynamo is adopted in this chapter for detailed quantity measurement. Three-dimensional printing (3DP) is one of the additive manufacturing technologies which is recommended to be used in construction. 3DP is aiming to create complex and customized geometries. This chapter demonstrates how to apply the Dynamo scripts of detailed quantity take-off for estimating the volume of elements created by 3DP. Dynamo as a quantity take-off Add-in in Revit is always used for detailed quantity take-off or precise model created. After the detailed quantity take-off from Revit, the data can be exported into Excel extension, which allows the quantity surveyors to insert the price per unit to the file and to generate a Bill of Quantity (BOQ). This chapter will offer a procedure for applying Dynamo through two selected case studies.

22 December 2021
Verified
Book Chapter
Open access
PDF file
ASAnqi SHI
Anqi SHI
Sara ShirowzhanSara Shirowzhan
Sara Shirowzhan
Samad SepasgozarSamad Sepasgozar
Samad Sepasgozar
Three-dimensional printing in construction (3DPiC) is known as a trending technology in the construction industry. While scholars and practitioners seek to learn more about the applications of 3DPiC, there are no efficient workflows and open data sets available for further investigations. This paper intends to present the data produced in a laboratory for creating new models. The paper first presents the experimentation data collected from 60 models, and selected thermal digital images can be used for further sustainability analysis. The recorded data includes the time of crafting each layer of the model, the total time of creating a model and thermal measures. Based on the 60 experimentations and an intensive literature review, the paper presents a proposed computational workflow, including the use of Revit, Dynamo, Fusion 360, Navisworks and a selected 3D printer, which can be utilised for further data collection and analysis in the field. This model will assist in automating the cost estimation as an upgrade for 3DPiC. This paper is helpful for scholars and practitioners since it shows how laboratory data can be helpful for construction operation design.