In the paper, a cascade predictive control strategy is proposed for the hydraulic AGC (Automatic Gauge Control) system of hot rolling mills based on the data driven control theory to solve the problem of inaccurate indirect measurement and long time-delay direct measurement. Because of the influence of disturbance and uncertainties, press DAGC (Dynamic Automatic Gauge Control) secondary loop control system is added to monitor AGC main loop control system. The proposed method can improve the control precision and ability of disturbance rejection. Simulation results show that the control strategy is effective and has a better control performance.