In order to study deposited sediment settlement and consolidation mechanisms, sediment settlement experiments were conducted using a settlement column. Based on the experimental results, sediment settlement stage definition, excessive pore pressure (EPP) dissipation, and consolidation constitutive equations are discussed. Three stages, including the free settlement, hindered settlement, and self-weight consolidation settlement stages, are defined. The results of this study show that sediment settlement is mainly affected by the initial sediment concentration and initial settlement height, and the interface settlement rate is linearly attenuated with time on bilogarithmic scales during the hindered settlement and self-weight consolidation settlement stages. Moreover, the deposited sediment layer in the self-weight consolidation settlement stage experiences large strains, and the settlement amount in this stage is about 32% to 59% of the initial height of deposited sediment. EPP is nonlinearly distributed in the settlement direction, and consolidation settlement is faster than EPP dissipation in the self-weight consolidation settlement stage. Consolidation constitutive equations for the hydraulic conductivity and effective stress, applicable to large-strain consolidation calculation, were also determined and fitted in the power function form
Settlement deformation in the foundation with miscellaneous fill and soft soil was typically calculated by summing up the settlement in each individual layer. However, this calculation method did not involve settlement deformation by embedding miscellaneous fill particles into soft soils under external loads, thus inducing significant settlement prediction error. To solve this problem, a laboratory testing device was developed to study the mutual embedding for specimens with different miscellaneous fill particle sizes, external loads, and particle materials. Testing results indicate that a larger particle size and subsequently the smaller specific surface resulted in greater mutual embedding settlement due to the smaller resistance. In addition, higher external loads and smaller interface friction both induced larger settlement. Based on these results, a theoretical calculation equation of settlement due to the mutual embedding of miscellaneous fill and soft soil was proposed. The calculated settlements were found to be well matching with the experimental results.
Embedding soft soil particles with high moisture content into miscellaneous fill with large pores under overlying loads is easy. It produces mutually embedded settlement, which is an important component of total foundation settlement during calculation. In this study, influences of interface friction on mutually embedded settlement, particle displacement, pore and contact characteristics, and mutually embedded development laws were analysed by using the particle flow method. Research results demonstrate that mutually embedded settlement decreases first and then stabilizes with the increase in contact friction factor and continuously attenuates with normal stiffness. Under the loads, particles at the contact surface move downward and squeeze surrounding particles laterally, thus causing particles to slide at the miscellaneous fill channel upward. Consequently, porosity of particles in miscellaneous fill channel increases. The force chain at the contact surface inclines around, while that at the miscellaneous fill channel presents approximately horizontal distribution. Compared with 35 and 45 mm particles, the mutually embedded settlement of 15 and 25 mm particles is slightly increased with loads. Particle size can relieve the influences of loads on mutual embedding. When particle size is larger than 25 mm, loads can significantly influence mutual embedding. Research conclusions can provide a reasonable theoretical foundation for calculating or predicting settlement of miscellaneous fill‐soft soil composite foundation.
Negative vacuum pressure hardly reaches deep soils due to the drain board bending and serious blockage with the existing vacuum preloading methods (VPMs), thus resulting in poor reinforcement relative to practical engineering applications. To address this issue, this paper proposes a vacuum preloading method with pumping and discharging (a new dredger filling foundation processing technique based on vacuum preloading). This new VPM is developed through technological improvement and plastic drain board innovations in traditional VPMs. The new VPM uses a plastic vertical drainage board with double drainage channels, and the core board is in a “tic‐tac‐toe” shape with a hollow centre and square pipeline channels. It can execute air and water drainage. Vacuum transfer holes were set at two grooves, every 2‐3 m from the central pipeline of the core board. Grooves at two sides of the core board and filter membrane were rolled together to improve drainage. In addition, the vacuum pipe, tube connector, and core board centre of the vertical plastic drainage board were connected directly and securely. A stereoscopic vacuum transmission system composed of a horizontal and vertical drainage system was built. In this vacuum transmission system, the transfer route was shortened, and the loss of vacuum along the route was decreased. The negative vacuum pressure was transferred to different soil depths through the central pipeline of the core board to accelerate the dissipation of pore pressure in soil mass and prevent vacuum pressure loss caused by drainage board bending, thus improving the reinforcement effect. Dredger filling silt foundation reinforcement by VPM and VPM with pumping and drainage were compared in laboratory simulations and field tests with different drainage boards. Test results show that the loss of vacuum pressure along the drainage path was relatively smaller in the new physical vapor deposition (PVD), and the pressure transfer efficiency was increased. Deep soil mass was reinforced effectively by using the new PVD. After reinforcement, the physical and mechanical properties of soil layers were improved. Moreover, soil strengths were remarkably improved, with sharp reductions in natural moisture content and porosity. Then, the transfer law of vacuum on different drainage boards and the reinforcement mechanism of VPM with pumping and drainage were analysed. Research conclusions show the superiority of VPM with pumping and drainage in terms of effectiveness and soft foundation reinforcement. This study provides a theoretical basis for the application and development of the new VPM.
The construction of steel sheet pile cofferdams is a systematic project. Simplified construction sequences are widely used to facilitate the numerical modeling of cofferdams, while the mechanical behaviors of cofferdams with different construction sequences have yet to be understood. In the present study, finite element models of steel sheet pile cofferdams with different construction sequences were established, based on the temporary cofferdam of the Shenzhen–Zhongshan Link. The mechanisms of simplified construction sequences on bending moment were revealed by analyzing the displacements and contact press of steel sheet piles. The distribution of bending moment with elevation demonstrates the importance of the layered backfill process in numerical modeling. In addition, a finite element model of the cofferdam considering steady-state seepage was also established. The comparison of the hydrostatic pressure results and the bending moment results obtained by engineering experience and seepage analysis were discussed. The analysis results showed that the empirical method overestimated the maximum bending moment of the inner side of piles, which led to a more conservative design of the cofferdam. This work can serve as a reference for numerical modeling of steel sheet pile cofferdams and contribute to risk assessment in related engineering projects.
7 August 2024 in Bulletin of Engineering Geology and the Environment